24 hours = 1 day
2400 hours = 100 days
That's somewhat shorter than 2 years.
(2 hrs 45 min) * 6 = 2.75 hrs * 6 = 16.5 hrs = 16 hours and 30 min
2400/2 = 1200
there will be 105,168 hours
6 hrs and 22 mins
2 years=24 months
5 hrs 41 min
20% of 12000 is 2400. It is equal to .2 * 12000, which would be 24000/10, 2400.
how much will it cost for HRS 2 years course in STI in general santos city
(2 hrs 45 min) * 6 = 2.75 hrs * 6 = 16.5 hrs = 16 hours and 30 min
2400/2 = 1200
Yes, 2400 divided by 2 = 1200
there will be 105,168 hours
Not a good idea!.
two cenzurs equal to (10)²years or 2(10)²years
6 hrs and 22 mins
The energy transferred can be calculated by multiplying the power (2400 watts) by the time (1 hour = 60 minutes): Energy = Power x Time. 2400 watts * 1 hour = 2400 watt-hours. To convert watt-hours to kilowatt-hours, divide by 1000: 2400 watt-hours / 1000 = 2.4 kilowatt-hours. Therefore, 2.4 kilowatt-hours of energy is transferred when a 2400 watt washing machine is used for 60 minutes.
2400 cm equals 2.400 meter, so 2400 is bigger.