answersLogoWhite

0

How calculate drillstring?

Updated: 9/19/2023
User Avatar

Wiki User

13y ago

Want this question answered?

Be notified when an answer is posted

Add your answer:

Earn +20 pts
Q: How calculate drillstring?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

How do you calculate WACC?

how to calculate WACC how to calculate WACC how to calculate WACC how to calculate WACC


How do you you pump a balanced cement plug?

Balanced cement plug is pumped through drill string or open-ended tubing. 'Balanced Cement Plug' means that the top of cement outside the drillstring/ tubing will be the same height as the top of cement inside the drillstring at the end of pumping. The drillstring/ tubing is then slowly pulled from the wet cement, allowing the cement inside the string to fill the centre of the plug. There are lots of refinements in this method with open hole cement retainers or high viscosity 'cushions' often placed below cement. In vertical hole, most balanced plugs are successful. In extended reach wells, failure rates can be high with cement slumping and mixing with synthetic based muds. A typical checklist to improve cement plug success in extended reach wells would have: 1. Always use a tailpipe. This reduces the disruption to the plug caused by removal of the drillstring. 2. Clean up the hole thoroughly before pumping cement. Cement is an excellent hole cleaner. Many 'flash set' events reported are really packoffs caused by cement picking up a cuttings dune. 3. Put a diverter tool with BIG holes on the bottom of the tailpipe. This directs fluids up the hole during cementing 4. Use a scavenger spacer in front of the cement job to convert the formation from oil wet to water wet. 5. Slow down pumping to 1 BPM while displacing cement into open hole. This reduces mixing of cement and mud. 6. Put a cushion below the cement plug. A cement retainer is best. If a viscous cushion is spotted, weight the cushion to 1 ppg below the cement weight. 7. Gravity is NOT on your side. Cement can stay inside the tail pipe as you pull it from the plug. Pump the volume of cement inside the tailpipe as you pull the tailpipe from the plug. 8. Circulate clean the long way with the bottom of the tailpipe at the planned cement plug top.


How do you calculate ckg?

how do i calculate CKG?


How do you calculate pka?

how do you calculate pKa


How do you calculate the powerfactor?

how to calculate the powerfactor in capacitor


How do you say calculate in Spanish?

Calcular = to calculate


What is 400 subtracted from 2000?

-1600


How do you calculate m2?

How do I calculate floor space of 600 sqare meters, and how do I calculate 600 cubic meters


How do you calculate the area of a pyrimid?

i am trying to calculate my loft space, also what shape is a toblerone box and how do you calculate that


How do you can calculate BBS?

You search 'how do you calculate BBS' on google


How do you calculate uninterruptible power supply?

You can't "calculate" it...


How do you calculate a ratio from a percent?

Formula to calculate the ratio