Unless otherwise specified you need a 5/8th inch by 8 foot copper clad rod. A great trick is to drive it in at a 45 degree angle and bend it up as you go so it ends up straight after it drive in all the way. This keeps you from hitting hard pan and keeps you from having to get on a ladder to drive the rid which can be kinda dangerous. Leave about 4 inches out of the ground for you ground clamp. For a 200 amp service use #4 armored ground. For 125 amp or 100 amp you can use #6 armored ground wire and an armored ground clamp.

The NEC allows that for ANY connection to ground rod, #6 solid copper is the largest conductor required. The ground rod is SUPPLEMENTAL, and only in rare circumstances is the ground rod your primary ground. The sizes given above are for your primary grounding connection, such as a metal water line.

User Avatar

Wiki User

11y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: How do you install a ground rod to a house meter base?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

Can you install 100 amp service in 200 amp meter base?

No, each size service needs its own meter base.


200 amp electric service Do you ground the meter pan and the circuit panel?

Ground the meter base only if it's a duplex. Otherwise, ground at the main switch or panel.


What size ground wire to water meter for 400 amp service?

You need 2 ground rods of 8' in length. One under the meter base and another one 6' to either side of the meter base. Drive them into the ground with just enough sticking up to connect the ground wire.


How do you install a 600 amp meter socket?

Most municipalities and power companies require that meter bases be installed by licensed electricians.Do not attempt to install the meter base yourself. There are far more realistic ways of saving a few dollars.


How do you install a baseball base?

some you just put on the ground ... others have a pole that on the bottom of the bag that you stick into the ground ...


How long it takes to install a domestic electric meter for a new customer?

In the US, it only takes a couple of minutes for a power company electrician to install an electric meter on a new service. The drop from the power line is made to an electrical connection box in the house, and the box has the meter base built into it. The meter basically "bayonets" into the base, and then is secured. Some kind of a "tamper indicator" is then affixed so that the meter cannot be removed without breaking that indicator. With the panel in place and properly wired and inspected, the power company electrician can have the meter in and buttoned up in just a couple of minutes.


Can more wires be ran from the meter base to supply a shop from your house?

No, you cannot put but one set of wires in a meter base. The way to go about this, is to mount an outside panel beside your meter base. Panel sized to existing house service, equipped with two main breakers. One to re-feed the house panel the other to feed your shop.


Exterior electrical service wires connected on a house 3 feet from what?

The point of connection will be at the utility meter base, Whether the service is installed from a pole (overhead) or underground. In an overhead installation, the conductors may physically attach to the house at points other than the meter base, but they will always end up at the meter base.


How do you ground your meter box to your breaker box?

The grounding is done through the metal nipple that connects out of the back of the meter base and into the back of the breaker panel.


Does the ground wire on a 200 amp panel need to be looped through both ground rods?

Not looped but connected to both ground rods and then connected to the meter base.


Can you install a 150 amp meter base and still have a 100 amp main panel?

The wire size in a meter stack is governed by the size of the first over current device.


Where are transient voltage most dangerous?

when reading voltage at the meter base where power comes in the house.