Best Answer

Assuming you are referring to 16 by 16 feet,

16 sqrd = 256

453/256 = 1.77 blocks.

User Avatar

Wiki User

6y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: How many 16 x 16 blocks to cover 453 sq ft?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

How many ounces in 453 grams?

453 grams equals one pound or 16 ounces.


How many 16inch square blocks do you need to cover an area of 61 inches by 58 inches?

16 inch blocks have an area of 16 x 16 = 256 sqinches . You want to cover an area of 61 x 58 = 3538 sqinches. So you need at least 3538/256 = 13.8 blocks.


453 grams of corn syrup equals how many ounces?

453 g = about 16 ounces.


How many 16 x 16 square blocks will cover a 20 x 12 foot space?

if it is 16in by 16in blocks then 426 to 427 blocks if it is 16ft by 16ft blocks then just 1. You will haveto cut part of the block tho and move it to the open space.


How many grams are in a 16 oz jar?

16 ounce = 473,1765 mL


How many 8 by 16 patio blocks will it take to cover 300 square feet?

337 and 1/2 Add 10% for breakage.


How many Miami city blocks equals one mile?

16


How many 8x16 cement blocks would it take to cover 144 square feet area?

Assuming they are 8 inch*16 inch blocks, 144 square feet = 144*12*12 square inches. So number of blocks required = 144*12*12/(8*16) = 162


How many blocks do you need for a 28 inch firering?

28 x 3.14 /16 = 5.5 each course of 16 in blocks requires 5.5 blocks


How many bits are in the Subnet ID blocks?

16 bits per block . 8 16bit blocks = 128bits


How many blocks that are 16 inches by 16 inches would be needed to fill 450 sq feet?

253.125 blocks.


How many 16 inch blocks in 196 square feet?

A 16in x 16 in block has an area of 16*16 sq inches = 16/9 sq feet. To cover 196 sq ft you will require a minimum of 196/(16/9) = 196*16/9 = 110.25 blocks, that is 111 blocks. However, this assumes that the area is well behaved and that almost all offcuts are used. In real life that is a very unrealistic assumption and you should allow at least 5% for wastage.