53 and 1/3 paving slabs exactly.
45 required actually its 75 required (15 * 5)
first lets convert m to mm.we know, 1 m=1000 mm. 5 m =5000 mm and 8m=8000mm. Now, no.of paving slab = area of flags /area of slab . =5000 X8000/450 x 450. =197.5 = 197 slabs.
Area of paving slab = 0.3 m * 0.3 m = 0.09 sq metres. So number of slabs required = 22/0.09 = 244.44.. recurring = 245. However, that is the minimum mathematical answer. In real life you may well require more if the area to be covered is awkward or if you do not want to use all the off-cuts and end up with a mosaic.
24ft.
Joe needs 460 paving slabs to surrond the pond.
220 should do it.
Depends on the linear dimensions of both the slabs and the ground.
53 and 1/3 paving slabs exactly.
To calculate how many 400mm x 400mm paving slabs fit in one square meter, first convert the dimensions of the slab to meters: 0.4m x 0.4m. The area of one slab is 0.16 square meters (0.4m x 0.4m). Therefore, to find how many slabs fit in one square meter, divide 1 square meter by the area of one slab: 1 / 0.16 = 6.25. Since you can’t have a fraction of a slab, you can fit 6 slabs in one square meter, with some leftover space.
Area of slab = 0.6 m * 0.6 m = 0.36 sq metres Minimum number of slabs required = 9/0.36 = 25. This minimum number is based on the assumption that the area to be covered is a reasonable shape so that only a few slabs need cutting and that all the resultant offcuts are used - even if part of the area looks like crazy paving!
45 required actually its 75 required (15 * 5)
You would need a total of 160
first lets convert m to mm.we know, 1 m=1000 mm. 5 m =5000 mm and 8m=8000mm. Now, no.of paving slab = area of flags /area of slab . =5000 X8000/450 x 450. =197.5 = 197 slabs.
Area of paving slab = 0.3 m * 0.3 m = 0.09 sq metres. So number of slabs required = 22/0.09 = 244.44.. recurring = 245. However, that is the minimum mathematical answer. In real life you may well require more if the area to be covered is awkward or if you do not want to use all the off-cuts and end up with a mosaic.
24ft.
Each slab is .5 x .5 = .25 square m. Yard is 8x 5 = 40 square m so you need 40/.25 = 160 slabs