One cubic yard is equivalent to 27 cubic feet. A 60-pound bag of Quikrete typically yields about 0.45 cubic feet of concrete. Therefore, to fill one cubic yard, you would need approximately 60 bags of 60-pound Quikrete bags (27 cubic feet ÷ 0.45 cubic feet per bag = 60 bags).
To determine how many 60-pound bags of sand are needed for 4 yards, first convert yards to pounds. One cubic yard of sand weighs approximately 1,000 to 1,200 pounds, depending on the type of sand. Assuming an average weight of 1,000 pounds per yard, 4 yards would weigh around 4,000 pounds. Dividing 4,000 pounds by 60 pounds per bag gives you about 67 bags of sand needed.
We would have to know how deep you want it. I would start with 6 x 80 pound bags.
60 pounds is 60/1 of one pound.
1 ton = 2000 pounds 2000/60 = 33.3 bags of 60 pounds to make 1 ton
Without some direction as to what the bags must contain, I can make as many bags as I want. I can make as many bags as I have bags. If I have to put at least one writing utensil in a bag, that's 60 bags. If I have to put one of each writing utensil in a bag, that's 12 bags.
Quikrete is sold in 60 pound bags, therefore we will need 1.5 bags. Each 60 pound bag produces 0.45 cubic feet, so times 1.5; 90# bag will yield 0.675 cubic feet .
AnswerThere is just under half (0.45) of a cubic foot in a 60 pound bag of quikrete.It takes 133 pounds of quikrete to make 1 cubic foot, so...- there is 0.6 cubic feet (80/133) in one 80 pound bag, and it takes one and two-thirds 80 pound bags of quikrete to make 1 cubic ft (133/80 = 1.66).- there is 0.45 cubic feet (60/133) in one 60 pound bag, and it takes about two and one-quarter 60 pound bags of quikrete to make 1 cubic ft (133/60 = 2.22).- there is 0.3 cubic feet (40/133) in one 40 pound bag, and it takes three and one-third 40 pound bags of quikrete to make 1 cubic ft (133/40 = 3.33).Multiply by 27 to get cubic yards (so it would take 3,591 pounds or 60 sixty pound bags to make a cubic yard).To further help calculate how much you need for your project, you can visit:http:/www.quikrete.com/Calculator/Main.asp#concrete
AnswerThere is 2/3 cu. ft. per 80 lb. bag of pre-mixed concrete. AnswerIt takes 133 pounds of quikrete to make 1 cubic foot, so...- there is 0.6 cubic feet (80/133) in one 80 pound bag, and it takes one and two-thirds 80 pound bags of quikrete to make 1 cubic ft (133/80 = 1.66).- there is 0.45 cubic feet (60/133) in one 60 pound bag, and it takes about two and one-quarter 60 pound bags of quikrete to make 1 cubic ft (133/60 = 2.22).- there is 0.3 cubic feet (40/133) in one 40 pound bag, and it takes three and one-third 40 pound bags of quikrete to make 1 cubic ft (133/40 = 3.33).Multiply by 27 to get cubic yards (so it would take 45 eighty pound bags to make a cubic yard).To further help calculate how much you need for your project, you can visit the Related Link.
20
Depending on the size, bags of ice can be from $1.00 up.
It depends on how big the bags are. There are 20 100-pound bags, 40 50-pound bags, or 200 10-pound bags, etc. in a ton.
If your talking about 4'x4'x4" thick it will take about 12 bags. Most 60# bags will do .45 cubic feet and that slab would be about 5.3 cubic feet wich equals 11.77 bags.. Mike
According to the related link below; the required amount to cover 1 square yard with 4 inches of concrete is 6.6 60 pounds bags.
Each 60 pounds bag of ready mix concrete will make .45 cubic foot of concrete. There are 27 cubic feet in a cubic yard. You will need 60 bags of 60 pound premixed concrete to make 1 cubic yard.
Usually concrete mix comes in 40, 60 or 80 pound bags.
about 60 60lb bags
about 60 60lb bags