In 4 and a half days, there would be 4 whole days and a half of the next day, 12 out of the 24 hours perhaps !
It is about 4 and a half months.
If you drive for 8 hours a day it will take you about 4 and a half days.
4 days
4 days
1/4. After 27 days, half of the material will have decayed. After another 27 days half of the remaining material will have decayed. Half of half is 1/4.
A tour event lasts 4 days. Thursday, Friday then half way cut, then Saturday and Sunday.
1.5 x 6/1.5 x 4/0.5 = 1.5 x 4 x 8 = 48
There are 36 hours in one and a half days.
In 3 days there are 144 half hours.
4 and a half days
Start with the 9 weeks: 9 wks * 7 days/wk = 63 days Add however many days are defined to be half a week (3 or 4). Answer will be 66 or 67 days. Note that 9 1/2 weeks lasts much longer if you're Mickey Rourke.
183 days homie.