There are 3 feet in one yard. Therefore, 125 feet is equal to 125/3 = 41 remainder 2 or 41 yards 2 feet.
There are 3 feet in one yard. Therefore, 125 feet is equal to 125/3 = 41.6 recurring (that is, 41.6666...) feet.
125 ft x 60 ft = 125*60 = 7500 sq feet.125 ft x 60 ft = 125*60 = 7500 sq feet.125 ft x 60 ft = 125*60 = 7500 sq feet.125 ft x 60 ft = 125*60 = 7500 sq feet.
413 ft. equals how many yards and ft?
Divide feet by 3 to get yards. 27 feet=9 yards. 36 feet=12 yards. 51 feet=17 yards.
To calculate the volume of the trench in cubic feet, multiply the dimensions: 1 ft (width) x 2 ft (depth) x 125 ft (length) = 250 cubic feet. To convert cubic feet to cubic yards, divide by 27 (since there are 27 cubic feet in a cubic yard): 250 cubic feet ÷ 27 ≈ 9.26 cubic yards. Therefore, you will need approximately 9.26 yards of stone to cover the trench.
375 feet is 125 yards.
There are 3 feet in one yard. Therefore, 125 feet is equal to 125/3 = 41.6 recurring (that is, 41.6666...) feet.
125'x210' (26,250 square feet) = 2,916.6 square yards.
One yard is 3 ft so 125 yards is 375 Feet.
125 ft x 60 ft = 125*60 = 7500 sq feet.125 ft x 60 ft = 125*60 = 7500 sq feet.125 ft x 60 ft = 125*60 = 7500 sq feet.125 ft x 60 ft = 125*60 = 7500 sq feet.
413 ft. equals how many yards and ft?
Divide feet by 3 to get yards. 27 feet=9 yards. 36 feet=12 yards. 51 feet=17 yards.
125 feet, or 1500 inches
if you mean sq. yards, you divide by 9 - 13.89 sq. ft.
413 feet America = 413.000826 International feet = 137.666942 yards
4 feet=1.33333333 yards
13 ft = 4.33 yards