27 cubic feet = 1 cubic yard
60' x 60' x 2' = 7,200 cubic feet = 2662/3 cubic yards
assume 4" thick. 4"x48"x192"/(36"x36"x36") = 0.79 yards 36" in a yard
16 ft * 47 ft * 4 inches =16/3 yards * 47/3 yards * 4/36 yards = 9.3 yards approx.
137.5 cubic feet or 5.09 cubic yards.
You need to specify the slab's width and the length as well.
5.93 cubic yards.
0.86 cubic yards is needed.
A minimum of 5.93 cubic yards is needed.
How thick? Gotta have thickness to calculate cubic yards.
You will need a minimum of 74.1 cubic yards.
assume 4" thick. 4"x48"x192"/(36"x36"x36") = 0.79 yards 36" in a yard
That depends on the length and width of your construction.
18.52 cubic yards. Adjusting for safety, you should order a minimum of 19.5 cubic yards.
16 ft * 47 ft * 4 inches =16/3 yards * 47/3 yards * 4/36 yards = 9.3 yards approx.
13 1/3 cubic yards
You need to specify the slab's width and the length as well.
137.5 cubic feet or 5.09 cubic yards.
At 4" thick you would need at least 7.04 cubic yards. At 6" thick you'll need at least 10.56 cubic yards. If the slab is 2" thick, you'll need 3.52cubic yards.