It depends on whether the dimensions given are in feet or yards or metres or some other unit.
22.2222 cubic yards (the 2s keep on going).
600 US gallons = 138,600 cubic inches = 80.208333... cubic feet = 2.9707 cubic yards. (rounded)
1 yd³ = 201.97 gallons 403.94 ÷ 5 = 80.79 buckets
32 cubic feet=4x8x1 27cubic feet in a cubic yard You will need a yard plus 5 cubic feet.
i dont think you phrased your question correctly
48,000 gallons of water
133.33 cubic yards, that's 400 feet
None because it's a hole but 6 cubic yards of dirt will fill it up.
It will take 800 cubic yards 1/3 compaction.
You also need to specify the average depth.(And by "yards" we assume you mean cubic yards).
56,000 yds3
You are mixing volume (square yard) and area (length x width). How deep do you want the dirt? One foot deep you need about 80 square yards of dirt.
11 cubic yards of planting mix converted to how many tons?
About 3 yards with a little left over. 2.78 yards.
0. Do you mean 70 cubic feet? 1 sq yd = 27 cu ft.
2.37 cubic yards.
Sorry the first answer was in square yds. Cubic yards would be 0.308639