3 ft = 1 yd
→ 240 ft × 2 ft × 6 ft = (240 ÷ 3) yd × (2 ÷ 3) yd = (6 ÷ 3) yd
= 80 yd × ⅔ yd × 2 yd
= 106⅔ cu yd
≈ 106.67 cu yd
If you are ordering skips to contain the spoil from a hole dug to those dimensions you will need to order more capacity as the spoil will be loose and take up more volume.
240 x 2 x 6 = 2880 cubic feet. One (cubic) yard is 27 cubic feet; 2880/ 27 =106.67 yards
It is 106.66... (repeating) CUBIC yards.