no
In the US, the common usage of these colors is: BLACK: Hot - connected to one phase of the service AC. WHITE: Connected to the Neutral of the service AC. GREEN: Connected to the GROUND bus at the service entrance. At the service entrance, the GROUND and the NEUTRAL bus are connected together.
In the CEC (Canadian Electrical Code) the code states that from the outside meter base to the first over current device that, the run can be no longer than 20 feet.
Home electrical service in the UK is 230 volts at 50 hertz.
You would need to shutdown the power whenever you are working on the electrical service.
2 AWG Aluminum.
no
Are you asking about home electrical service? sevrice entrance cables need to be three feet away from a window
At the weather head on top of the electrical stack.
Service conduit must be secured every 10 feet and withing 3 feet of a service box.
Yes, -that is a fact. -Do you have a question.
In the US, the common usage of these colors is: BLACK: Hot - connected to one phase of the service AC. WHITE: Connected to the Neutral of the service AC. GREEN: Connected to the GROUND bus at the service entrance. At the service entrance, the GROUND and the NEUTRAL bus are connected together.
The service is your electrical distribution service. It is what the power authority connects to in your house to service you with electrical power.
Not really enough information to answer specifically - but this is a charge that is generally used when someone is being charged with the theft of electrical service - water service - gas service - phone service - cable service - etc., although other "services" can be covered under this statute also.
The service is your electrical distribution service. It is what the power authority connects to in your house to service you with electrical power.
High current service entrance equipment and MCC (motor control centers) all use bus bars in their construction.
If an electrical contractor is doing the installation, ask them how many dollars are they bonded for. Ask to see the electrical permit that they take out on your project. If the project is permitted and inspected by an electrical inspector, then any thing that might go wrong in the future with the new service will be covered under your house insurance policy.
Connect other end to the ground lug in the service entrance part of your panel.