The minimum cover requirements for direct buried conduits in vehicular areas is governed by the voltage in the conduit. Under 750 volts 600 mm (24 inches), over 750 volts 1000 mm (36 inches).

User Avatar

Wiki User

13y ago

Still curious? Ask our experts.

Chat with our AI personalities

FranFran
I've made my fair share of mistakes, and if I can help you avoid a few, I'd sure like to try.
Chat with Fran
CoachCoach
Success isn't just about winning—it's about vision, patience, and playing the long game.
Chat with Coach
EzraEzra
Faith is not about having all the answers, but learning to ask the right questions.
Chat with Ezra

Add your answer:

Earn +20 pts
Q: What is the minimum burial depth of ridged metal conduit below a residential driveway?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Continue Learning about Electrical Engineering

Do you have to run wiring in conduit if its in the ground?

Wire in conduit for underground feeders has to have an insulationrating for wet and damp locations. In the marketplace there is also wiring thathas an insulation rating for direct burial that does not need to be installed into conduit.


What size wire do you need going from a 20KW 83A generator to the main 200A automatic transfer switch?

In conduit? direct burial? distance?


How do you run a 480 v line?

The cable can be run in various ways. Three common distributions are; in conduit, direct burial and aerially between poles.


How do you terminate direct burial wire?

Answer for USA, Canada and countries running a 60 Hz supply service.Termination of direct burial wire is done as you would terminate any other set of wires. However, direct burial does not mean you can direct bury the terminations. The wire must be brought into a building by an approved method; or the wire must be brought into a box designed for burial, with the box accessible from the surface of the ground; or the wire must be brought into a piece of equipment that is partially buried and designed for that purpose.In no case should the wire reach a depth of less than the minimum required depth for the installation without being protected by conduit. And in no case should the wire enter a building without conduit unless installing UF cable is allowed without conduit in the installation.As always, if you are in doubt about what to do, the best advice anyone should give you is to call a licensed electrician to advise what work is needed.Before you do any work yourself,on electrical circuits, equipment or appliances,always use a test meter to ensure the circuit is, in fact, de-energized.IF YOU ARE NOT ALREADY SURE YOU CAN DO THIS JOBSAFELY AND COMPETENTLYREFER THIS WORK TO QUALIFIED PROFESSIONALS.


What is the designation on the conductors that are approved for direct burial?

USE, USE-2, and UF