r = 6.6825 feet.
sand weighs 100 pounds per cubic foot you have 100 x 50 x3/12 cu ft = 1250 cubic feet 1250 x 100 = 125,000 pounds = 125000/2000 = 62.5 tons
1250 + 8% = 1250 + 100 = 1350 or 1250 + 8%.
percentage of 1250 = 125000%1250 * 100% = 125000%
38% of 1250 yards= 38% * 1250= 0.38 * 1250= 475 yards
1250 is a whole number.1250/1 in fraction
1,250 cubic centimeters = 76.3 cubic inches
125 liters is about 27.496 Imperial gallons.
I think you mean LITERS and FILL. You have to know the volume of the pool in cubic meters. Multiply its length x height x width to get cubic meters. Multiply that by 1000 to get liters.
8.10 L
Typically around 1250 horsepower, from 500 cubic inches.http://en.wikipedia.org/wiki/Pro_Stock
3% of 1250 = 3% * 1250 = 0.03 * 1250 = 37.5
sand weighs 100 pounds per cubic foot you have 100 x 50 x3/12 cu ft = 1250 cubic feet 1250 x 100 = 125,000 pounds = 125000/2000 = 62.5 tons
1250 + 8% = 1250 + 100 = 1350 or 1250 + 8%.
15% off of 1250 = 1250 - (0.15 x 1250) = 1062.5
1250 to fraction = 1250/1
percentage of 1250 = 125000%1250 * 100% = 125000%
10% off of 1250 = 90% of 1250 = 1250*90/100 = 1125