A 100-A sub-panel would be fed from a 100-A breaker.
Wiki User
∙ 10y agoWiki User
∙ 11y ago100 amp.
A #3 copper conductor with an insulation factor of 90 degrees C is rated at 115 amps. Even though the panel is rated at a higher amperage it is the main breaker that governs the wire size.
Yes. Many installations have breaker totals higher that the main breaker of the panel. It is worked on a percentage basis. Not all of the breakers will be on at the same time. In a home, on a 100 amp panel the average load is 50 - 60 amps. The 100 amp main breaker is protecting the 100 amp rated panel board. If the load current goes higher that the panel board is rated at, the main breaker will trip to protect the board.
For a 100 Amp breaker panel it would be 2 AWG. For 150 Amps it would require 2/0 (2 ought) aluminum wire.
If there is a possibility of both operating simultaneously, then a 100 amp breaker (actually 80 amp if you can find one), and appropriate wiring would be required. Even if they were not expected to operate simultaneously, it would be prudent to wire as if they were.
You can. Using these size breakers in a 60 amp sub panel might be pushing the limit for breaking the sub panels feeder breaker. The breaker feeding the sub panel will have to be no bigger than 60 amps because of the main bus bar capacity of the sub panel. It would be better to install a 100 amp sub panel and then there would be a bit of a buffer and you will have the ability to add additional small load circuits.
There are two things to think about here. First of all a 200 amp breaker will not physically fit into a 100 amp panel. This is so designed because the panel buss is not designed to conduct 200 amps before the current is cut off. A 100 amp rating on the panel is the maximum amount of current that the manufacturer states, that can be handled safely. Second if the 200 amp breaker is in the main panel then everything downstream from that breaker has to be rated for 200 amp conductivity. The wire size will have to be 3/0 from the breaker to the first over current device in the sub panel which will be the sub panel's main breaker. The sub panel can not be a load center but will have to be a combination panel. I doubt that the 100 amp sub panel's main breaker lugs would be large enough to connect the 3/0 cable.
Yes.Additional InformationBreakers and fuses protect the wires to prevent fire. The 100 Amp breaker in the meter base (main) protects the wire from the meter base to the breaker panel. The 50 Amp breaker in the breaker panel protects the wire from the breaker panel to the outlet. Sometimes the 100 amp main breaker is located in the panel.If you are asking "Can you use two 50 amp breakers for the main breakers with a 100 amp service, then yes you can. The National Electrical Code allows you to use up to 6 breakers as the main overcurrent protection.
A #3 copper conductor with an insulation factor of 90 degrees C is rated at 115 amps. Even though the panel is rated at a higher amperage it is the main breaker that governs the wire size.
Yes. Many installations have breaker totals higher that the main breaker of the panel. It is worked on a percentage basis. Not all of the breakers will be on at the same time. In a home, on a 100 amp panel the average load is 50 - 60 amps. The 100 amp main breaker is protecting the 100 amp rated panel board. If the load current goes higher that the panel board is rated at, the main breaker will trip to protect the board.
Yes, but at every reduction in wire size there has to be a breaker sized to the smaller wire size. The wire size for 100 amp panels is recommended at #3 copper conductor. From the 200 amp feeder panel you will require a 100 amp two pole breaker for each of the two 100 amp services. Keep in mind that if you run the 100 amp services close to maximum this will take away the capacity of the 200 amp service for other branch circuits coming off of it. Also keep in mind that if the panels are located, not in the same building as the 200 amp service that the 100 amp panels will be treated as separate services and will have to be constructed like a 100 amp service. This includes ground rods. Also the bonding screw will have to be removed that connects the neutral buss to the panel enclosure.
It is not in parallel. You put a breaker in existing panel and use that to feed the subpanel. The Amperage of this subfeed breaker should match the rating of the new panel. For example a 100A breaker might be typical. Remember that ground and neutral are only "bonded" at the main panel. Usually a subpanel has a means to separate the neutral and ground in a subpanel. Be careful since everything about doing this is dangerous.Another AnswerYes, you can have two breaker panels in parallel. If you had a 100 amp panel on a 200 amp service (or increase the size of the service, check with your power company on the size of your service, you could add a second 100 amp panel in parallel with the first. You can have up to 6 disconnects per service, but they must be located adjacent to each other or in the same enclosure. So either install the second panel beside the first or a 100 amp disconnect beside the first panel and feed out of the disconnect to the new panel located where you need it.
The biggest circuit breaker in any home is the main breaker located in your main breaker panel that is installed where your electrical service cable comes into your home.
For a 100 Amp breaker panel it would be 2 AWG. For 150 Amps it would require 2/0 (2 ought) aluminum wire.
you propaly can't sub panel from 100 amp panel. Just not enough amperage to be worth while. i had to up grade t a 200 amp main first and then I was able to take a 60 sub panel from that.
If you are talking about a breaker in a house panel then a 15 amp breaker would be used. It is the smallest amperage breaker that you will find in a house panel.
#2 aluminum for 100 amp
Any size two pole breaker up to the value of 100 amps. Just make sure that the wire used to connect to the sub panel from the main panel is of a size to correspond to the breaker size. Wire amperages at 90 degrees C are, 30 amp #10, 40 amp #8, 55 amp #6, 95 amps #4,110 amps #3. Also keep in mind to look and see if the sub panel is rated at 100% or 80% load capacity. If it is only 80% load capacity then reduce the amperage rating of the conductors by 80% to obtain their new capacity rating.