answersLogoWhite

0


Best Answer

Intersection capacity utilization was created in 2000.

User Avatar

Wiki User

10y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: When was Intersection capacity utilization created?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

How to determine the Capacity utilization rate for a hospital?

actual capacity - potential capacity multiplied by 100


When was Knowledge Utilization Research Center created?

Knowledge Utilization Research Center was created in 2008.


When was The Einstein Intersection created?

The Einstein Intersection was created in 1967.


When was Intersection for the Arts created?

Intersection for the Arts was created in 1965.


When was National Center for Agricultural Utilization Research created?

National Center for Agricultural Utilization Research was created in 1938.


When was Intersection - film - created?

Intersection - film - was created on 1994-01-21.


What is the meaning of plant utilization factor in hydro power plants?

Utilization factor is a metric for power plants that describes how close the plant is operating to full capacity. For hydropower, utilization factor can be affected by droughts and seasonal variations in rainfall.


What has the author Judit Rimler written?

Judit Rimler has written: 'An international comparison of industrial capacity utilization' -- subject(s): Industrial capacity


What is the optimum utilization of a machine?

Optimum Utilization of Machine means to use a Machine in such a way that we produce at the maximum capacity after spending its minimum maintenance and other variable cost. In Short, Higher Productivity in low Cost.


What shape is created by the intersection of two planes?

Parallelogram.


When was Diminished Capacity created?

Diminished Capacity was created in 2008.


How do you calculate capacity factor?

Capacity utilization factor is a concept which refers to the extent to which an enterprise or a nation or an unit actually uses its installed productive capacity. Thus, it refers to the relationship between actual output that 'is' produced with the installed equipment and the potential output which 'could' be produced with it, if capacity was fully used.