Want this question answered?
On the basis of the information and context provided in the question, the answer must be "vertical lines".
On a vertical axis you should label it the "y-axis". Then make sure to put the numbers needed on the line! :)
The web should be in vertical.
my pregnancy test positive result should be vertical but is horizontal
Depends on whether it is vertical or horizontal. If it is vertical, it is undefined. If it is horizontal, it is zero.
foundation reinforcement
the reinforcement which provided at negative moment developed section.
the top reinforcement of beam (compression face of beam). it is provided to hold the stirrups in place.
Torsion reinforcement provided at the corner of two way slab to control cracking at corners.
3000 psi
On the basis of the information and context provided in the question, the answer must be "vertical lines".
Variable-interval schedule (VI) is a reinforcement schedule in which reinforcement is provided for the first response that occurs after a variable amount of time from the last reinforcer or the start of the trial interval.
Buldge is nothing but additional cover, provided reinforcement is not displaced. As such it is not structurally harmful if treated as properly.
See 1st vertical deflation then calculate
reinforcement is video
A doubly reinforced beam is provided reinforcement in compression side also as to take care of extra load due to big section and to take care of tension in compression side ie compressive stresses so the section is safe.
when making a blouse you should create Vertical buttonholes