I don't think you can convert a cubic dimension into a squared dimension as a cubic dimension applies to volume and a squared dimension applies to area. Length X Width = Area (squared dimension); Length X Width X Depth = Volume (cubic dimension). One square yard = nine square feet; One cubic yard = 27 cubic feet.
Converting square yards to cubic yards is like converting apples to Oranges or like converting miles per hour to kilograms. The square yard is a unit of area, whereas the cubic yard is a unit of volume. The yard: a unit of distance. The square yard: a unit of area. The cubic yard: a unit of volume. Let's think of some uses for each of those. The first one's easy. If you want to know how far it is from one goal post on a football field to the other goal post, you would use yards. If you want to know how much turf you will need to cover the field, you use square yards. If you want to know how much dirt (or gravel or Jell-O) you would need to cover the whole field to a depth of four inches, you would use cubic yards.
You don't. They're completely different things.
"Square feet" tells you how much paint, carpet, or grass you need to cover it.
"Cubic yards" tells you how much diced onion, pale lager, or concrete you need to fill it.
================================================
Another contributor provided labels, which always make everything crystal clear:
Square feet measures Area whereas cubic yards would measure Volume.
This is not a valid conversion. Square yards is a measure of area while cubic feet is a measure of volume.
This is not a valid conversion. Cubic units is a measure of volume while square units is a measure of area.
Can't answer because with cubic yards you need a third dimension.
What is a "mixer". - If by any chanco you mean a concrete transit truck, they go from 3 to about 15 cubic yards
There are 0.764555 meters in one cubic yard. To convert cubic yards to meters, you can multiply the number of cubic yards by this conversion factor: 26.94 cubic yards * 0.764555 meters/cubic yard ≈ 20.61 meters So, 26.94 cubic yards is approximately equal to 20.61 meters.
Approx 3.38 cubic yards.
There are 0.0011411411411411411 cubic yards in a 39 gallon trash bag.
How thick? Gotta have thickness to calculate cubic yards.
You will have to measure the length and width, in yards, and multiply. You can also measure it out in feet, multiply, and divide by nine. If you're pouring concrete, you need the cubic yards, not the square yards.
1000 square feet/9 = 111.1 square yards of concrete 6 inches thick. This is the same as 111.1/4.5 = 24.7 cubic yards of concrete.
40.1 cubic yards
The term "yards" of concrete means cubic yards.
You cannot "fill" a cubic measurement with a square measurement.I think you meant cubic yards.1 cubic yard = 27 cubic feet.Your concrete slab is 1600 x 4/12 cubic feet = 533.333333... cubic feet.533.333333... cubic feet / 27 = 19.753 cubic yards (rounded to third decimal).
39.1116 cubic yards
123.44 cubic yards
1 cubic yard = 27 cubic feet700 square feet x 1/2 foot = 350 cubic feet = 1226/27 cubic yards(12.963 cubic yards, rounded)
For 576 square feet at a depth of 4 inches, you will need 7.11 cubic yards.
At a poured depth of 4 inches, you will need 4.94 cubic yards.
.029 cubic yards of concrete weighs aproximately 93.96lbs