Generally the rule of thumb for this is 2.5 to 1, meaning you would need 2.5 cubic meters of sand to manufacture 1 cubic meter of concrete.
1 cubic meter
Depends on what it's a cubic meter of. A cubic meter of hay will be much lighter than a cubic meter of sand.
25
I'm assuming by bricki you mean aggregate? There are several different mixes of concrete that yield different strengths. One of the more common mixes is a 3/2/1 mix this combines 3 parts aggregate (crushed stone), 2 parts sand and 1 part portland cement. with this mixture to make 1 cubic meter of concrete you will need almost 1/2 cubic meter of aggregate, 1/3 cubic meter sand and 1/6 cubic meter portland cement mixed with about 75 liters of water. Different mixes use varying amounts of stone though the sand and cement mixture stays between 1 1/2 : 1 to 2:1
depends of the mass of what u are measuring
Concrete is a mixture of cement, sand, stone, and water. In a cuibic meter of concrete, , there is about 0.3 cubic meters of sand, or about 475 kg
approx 0.7 mc of sand
How much cement sand and stone do you need for 1 cubic meter of concre
twelve
1 cubic meter
0.8
FOR 1cubic meter of concrete block ,firstly we must know the mix ratio but if e.g we have the ratio of 1:2:4 , 1 is cement 2 is sand 4 is aggregate than we need these quantities for 1 meter cube 0.22 cubic meter cement which is 6.28 cement bags 0.44 cubic meter sand and 0.88 cubic meter aggregates
3 cubic meter
223kg
1 cubic meter of fine sand is equal to 1.25 tons
Loose dry sand is about 1.5 tonnes per cubic meter, so a tonne of sand would be about two thirds of a cubic meter.
Depends on what it's a cubic meter of. A cubic meter of hay will be much lighter than a cubic meter of sand.