1 yard = 3 feet
30 divded by 3 = 10 yards
10 yrds in 30 ft. because there are 3 ft per yrd.
The conversion between m and cm are given .On finding the relation we get as follows .
we know that , 1 yard =3 feet .
so ,now according to question,30 feet =10 yards .
There are 3 feet in one yard. The calculation would be 10 yards.
30 feet is 10 yards.
30 feet is 10 yards @3 feet per yard.
Ten
The answer depends on the units used for 30 and 60. It should be obvious to you that the square footage of a 30 ft x 60 ft area will be somewhat different form that of 30 yards x 60 yards!
55 ft = 18.33333 yards
31 feet = 10 yards 1 foot.
10 ft = 3 and 1/3 yards or 3 yards 1 foot.
My answer: 4.44444 cubic yards. Solution ='s 30 x 2 x2='s 120 cubic ft. Since a cubic yard contains 27 cubic feet, I divide 130 by 27, and obtain 4.44444 (an unending decimal, it appears) cubic yards required to fill the planter.
30 ft
5X30=150sq. ft. 150 sq. ft. / 9 sq. ft./sq. yard = 16.7 sq. yards
10 yards is 30 feet.
13.1 cubic yards, approx.
30 feet (3 feet per yard).
10 yards.
The answer depends on the units used for 30 and 60. It should be obvious to you that the square footage of a 30 ft x 60 ft area will be somewhat different form that of 30 yards x 60 yards!
3 feet in a yard so 30 ft=10 yds
30ft. Cubed
1 yard = 3 feet so 30 yards = 30*3 = 90 feet.
9.3 cubic yards of cement is required for this slab.
8 yards