One ton equal to how many cft
1 ton barmateck log=cft?
1 ton is 1000kgs 1m=3.28ft 1m*1m*1m=#.28*3.28*3.28=35.28CFT so 1TON=35.28CFT
1 cubic foot (cft) is equal to approximately 28.32 kilograms.
How much stone dust(quarry Waste) quantity can be calculate ? 1 tractor = ton ??
Whatever grain you are referring to, please 1.weigh in pounds exactly 1 cft of the same. (1'x1'x1'= 1 cft) 2.Note the weight. Now divide 1 ton (in pounds) by this. 3.You will get a figure which is in cubic foot. 4.Please estimate whatever height you would like to have for the heap. It is in foot. 5.Divide the cubic foot figure with this. 6.You will get area required in sq. ft. You can do the same exercise in metric if you wish. When you say 1 ton, there are 4 definitions. Maybe you should mention it clearly.
By unit of length and distance and conversion ,we can say that 1 cm =0.0328084 cft
I don't know the density of sand so I'll extimate. 1 cubic ft of water weighs 62.4 pounds. Sand weighs about 2.2 times as much as water. so 1 cft would weigh 62.4x2.2 = 137.28 lbs. I'll round to 140 1 ton of feathers is 2000 lbs, so is 1ton of sand. 2000 / 140 = 100/7 = 14.3 cubic feet.
The conversion rate between cubic feet (cft) and tons depends on the material being measured. For example, for compacted soil or sand, 100 cubic feet is approximately 3.7 tons. However, for lighter materials like mulch or topsoil, 100 cubic feet would weigh closer to 1.5 tons.
There are 35.314 CFT (Cubic Feet) in 1 CBM (Cubic Meter). So, if you have CFT, divide by 35.314 to get CBM. If you have CBM, multiply by 35.314 to get CUFT. There are 3.2808399 feet in 1 meter. Cubic means 3 sides, so 3.2808399 * 3.2808399 * 3.2808399 = 35.314.
0.43 cft
First assume the ratio of plaster is 1:4 (1 cement and 4 sand) now we have to plaster the wall having area of 100 sft assume the thickness of plaster 0.5 inches. first convert thickness in to feet so 0.5/12 = 0.0416 now to calculate the material use in cft so 100 sft x 0.0416 = 4.16 cft so we required 4.16 cft material to complete the plaster multiply it by dry factor 1.5 4.16 x 1.5 = 6.24 cft to calculate cement 6.24/(1+4) = 1.24 cft 1 cement bag volume 1.25 cft so calculate no of bags 1.24/1.25 = 1 bag to calculate sand (6.24/(1+4)) x 4 = 4.99 cft