I do not deal in metric tonnes, but maybe the following will help. We use 25 short tons (2000 lbs per ton) is equal to 19 cubic yards.
54 cubic feet is equal to 2.07 cubic yards.
26,000,000 cubic yards = 0.004769 cubic mile (rounded)
345 cubic yards equal: 69,680 gallons of water.
One gallon of water is equal to 0.004951 cubic yards.
Assuming solid limestone, not pulverized: Solid limestone weighs approximately 163 lbs per cubic foot. If we divide 2000 by 163, we come up with 12.27 cubic feet. a cubic yard is 27 cubic feet, so a ton of limestone (12.27 cubic feet) would be about .45 cubic yards.
One cubic yard is equal to 363 = 46656 cubic inches. Therefore, 625 cubic yards is equal to 625 x 46656 = 29160000 cubic inches.
44 US gallons is about 0.22 cubic yards.
A yard is 91.44 cm One cubic yard is 91.44x91.44x91.44=764554.857984 cubic cm, or .765 cubic meters. Concrete and sand are often measured in cubic yards. In metric countries it is measured in cubic meters. Roughly there are 1.3 cubic yards in a cubic meter.
Yes.
1.30795 (rounded)
52 cubic yards = 1,404 cubic feet.
93,312 cubic inches.