Nine square feet = one square yard.
408 sq ft / 9 = 45 1/3 sq yd
6 feet @3 feet per yard.
There are 9 sq ft of carpet in 1 sq yd so... 33/9 = 3.67 sq yds
The amount of concrete will depend upon the depth you require. Multiply the area in square yards by the depth in yards and you will get the volume in cubic yards of concrete you will require: 3 ft = 1 yd → 3 ft x 3 ft = 1 yd x 1 yd → 9 sq ft = 1 sq yd → 852 sq ft = 852 ÷ 9 sq yd = 942/3 sq yd 36 in = 1 yd eq for 6 in depth: volume = 942/3 sq yd x 6/36 yd = 157/9 cu yds required ordering 16 [cubic] yards of concrete will give you [just over] a 6 inch deep slab over that area. eq for 9 in depth: volume = 942/3 sq yd x 9/36 yd = 232/3 cu yds required ordering 24 [cubic] yards of concrete will give you [just over] a 9 inch deep slab over that area.
No because 4 yards equals 12 feet
7 sq yd = 63 sq ft
16 sq yd 1 sq yd = 9 sq ft
9 sq feet = 1 sq yd so 175 sq ft = 175/9 sq yds = 19.44.. sq yds.
1 sq. yd. = 9 sq. ft. 1000 / 9 sq. yd. = 1000 sq. ft. = about 111 sq. yd.
1 square yard equals 9 square feet, so 10 sq yd times 9 equals 90 square feet.
The area is 12 sq yards to get it in feet multiply by 9 Answer = 108 sq feet
1 sq yd = 9 sq ft 80 sq yd = (80 x 9) = 720 square feet
1 yd = 0.9144 m (exactly) 1 sq yd = 1 yd x 1 yd = 0.9144 m x 0.9144m = 0.83612736 sq m ≈ 0.836 sq m
71,280 sq. ft.
1 yd = 3 ft 1 sq yd = 1 yd x 1 yd = 3 ft x 3 ft = 9 sq ft ⇒ 1 sq ft = 1/9 sq yd ≈ 0.11 sq yd
9 sq ft = 1 sq yd ⇒ 1200 sq ft = 1200 ÷ 9 sq yds = 1331/3 sq yds ≈ 133.3 sq yds
1,296 feet.