408 sq ft / 9 = 45 1/3 sq yd
6 feet @3 feet per yard.
There are 9 sq ft of carpet in 1 sq yd so... 33/9 = 3.67 sq yds
The amount of concrete will depend upon the depth you require. Multiply the area in square yards by the depth in yards and you will get the volume in cubic yards of concrete you will require: 3 ft = 1 yd → 3 ft x 3 ft = 1 yd x 1 yd → 9 sq ft = 1 sq yd → 852 sq ft = 852 ÷ 9 sq yd = 942/3 sq yd 36 in = 1 yd eq for 6 in depth: volume = 942/3 sq yd x 6/36 yd = 157/9 cu yds required ordering 16 [cubic] yards of concrete will give you [just over] a 6 inch deep slab over that area. eq for 9 in depth: volume = 942/3 sq yd x 9/36 yd = 232/3 cu yds required ordering 24 [cubic] yards of concrete will give you [just over] a 9 inch deep slab over that area.
No because 4 yards equals 12 feet
7 sq yd = 63 sq ft
16 sq yd 1 sq yd = 9 sq ft
9 sq feet = 1 sq yd so 175 sq ft = 175/9 sq yds = 19.44.. sq yds.
1 sq. yd. = 9 sq. ft. 1000 / 9 sq. yd. = 1000 sq. ft. = about 111 sq. yd.
The area is 12 sq yards to get it in feet multiply by 9 Answer = 108 sq feet
1 sq yd = 9 sq ft 80 sq yd = (80 x 9) = 720 square feet
71,280 sq. ft.
1 yd = 3 ft 1 sq yd = 1 yd x 1 yd = 3 ft x 3 ft = 9 sq ft ⇒ 1 sq ft = 1/9 sq yd ≈ 0.11 sq yd
1,296 feet.
864 sq ft 96 sq yd
37.33 sq yd
1 yard = 3 feet so 1 sq yd = 3 ft* 3 ft = 9 sq feet. 1749 sq ft = 1749/9 = 194.33.. sq yards.