answersLogoWhite

0


Best Answer

21 truck loads. 35.7 Divided by 1.7 = 21

User Avatar

Wiki User

14y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: A contractor removed 35.7 meters cubed of earth from a building site If the contractors trucks can haul 1.7 meters cubed per load how many truckloads were moved?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

Siding Contractors?

form_title=Siding Contractors form_header=Dramatically change the look of your home with new siding. Get it installed with help from the siding pros! What kind of siding is currently on your exterior walls? =_ What are the measurements of the walls that need siding? =_ What type of siding would you like installed? =_ Do you need siding removed before the new siding is installed?= () Yes () No () Unsure


What are some asbestos regulations?

Many of the asbestos regulations in the UK concern the precautions that must be taken whenever it is found in a building and requires to be disturbed or removed. Any work carried out must be done by a licensed contractor. Anyone who is likely to be exposed to asbestos whilst at work must have mandatory training.


What was the amount of earth removed while building the panama canal?

25%


What is Shuttering Store and Where These Shuttering Stores are located in ChandigarhPanchkula Mohali?

Shuttering Store is Place Where you can Get all the Shuttering and Scaffolding Material required for various types of Building Construction Projects.Shuttering Store Provide these Materials on Hire basis to Building Contractors, during Construction of Building a Contractor Needs M.S Plates, Channels, Props, Cuplocks, Jacks,Joint pins, to create a temperory structure to support the concrete till the time it is Solidified enough to take its own weight. After that this materials is removed and returned to Shuttering Store.In Chandigarh, Panchkula,Zirakpur, Mohali Shuttering Market is Located at Plot No. 15-16 Ind Plots, Daffarpur On Ramgarh to Derabassi Road (One KM from Ramgarh Fort). VCC Shuttering House Call Us: +91 9915980350, +91 9417057587.


Moving House Contract?

Moving House Contract(Download)_________________________, referred to as CONTRACTOR, and _________________________, referred to as OWNER, agree:OWNER owns a building, of approximately ____________________ square feet, located at ___________________________.OWNER desires that the building be moved from its present location, ___________________________, to __________________________. The placement of the building at ____________________________ shall be as follows:______________________________________________________________CONTRACTOR acknowledges an adequate opportunity to examine the building at its present location and to prepare routes for the moving of the building.CONTRACTOR shall obtain any and all permits required for the moving of the building. Further, CONTRACTOR shall secure public liability insurance with a minimum limit for property damage of $__________ (_________________________________________ & __/100 dollars).CONTRACTOR shall move the building on or before ________________________, and the same shall be delivered on or before ________________________, time being of the essence. In the event of unsuitable weather, the deadline shall be extended by the number of days of unsuitable weather.CONTRACTOR shall not be responsible for making utility disconnections or connections, or preparation of foundations except as is expressly provided for in writing.CONTRACTOR shall place the building upon the foundation at the new location and CONTRACTORs performance be completed upon placing the building properly on the foundation. No later than the date of the move specified above (________________________).OWNER shall have caused all utilities to be disconnected, and all chattels or personal property to be removed from the building.CONTRACTOR shall not be required to commence performance until such preparations are readied, and any dates specified herein shall be extended accordingly.CONTRACTOR shall use reasonable care to prevent damage to the building, and shall restore any damage caused by the move.CONTRACTOR shall secure hazard insurance for the building itself in a minimum amount of $__________ (_____ _________________________ ______ & __/100 dollars).CONTRACTOR shall provide proof of such insurance coverage to OWNER upon request.OWNER shall pay to CONTRACTOR the total contract price of $__________ (_____________________________________ & __/100 dollars) for the services to be rendered hereunder as follows:_____________________________________________________________Such sums due shall constitute a lien upon the building. Final payment shall be due no later than________________________, provided, that OWNER shall not be required to make final payment until CONTRACTOR provides an affidavit to OWNER that all materials and laborers have been paid in full.Dated: ________________________________________________________________For _________________________ Owner_____________________________________For ___________________________ ContractorMoving House ContractReview ListThis review list is provided to inform you about this document in question and assist you in its preparation. This agreement can be modified for most property moves.1. Make multiple copies. Give an original to each signer. The owner should be sure to have one kept in the real estate files where the moved property resides.


How do you go about getting misdemeanors removed?

go to the court building ask to file a pardon


How was the giant peach removed from the top of the empire state building?

cuz thats weird


What event removed the political discontent in Washington of building the Pacific Railway in 1860?

The civil war.


How does the owner of the building resemble Hercules in Antaeus by Borden Deal?

The owner of the building resembles Hercules because like Hercules, he removed t.j. From his source of strength, the nature.


How do I remove my hydro meter?

In North America you don't. If the utility company catches you tampering with their meter you could be subjected to a fine and in extreme cases a disconnection from their supply. Once the seal is broken and the meter reader sees the broken seal it is reported to the utility company right away. If you need to get it removed for legitimate reasons call the utility company and they will remove it for you. In certain cases the utility company will allow approved contractors to pull the meter but the contractor has to abide by the utility company's rules.


How are cranes removed from the roof of tall buildings?

From what I have read: The crane "grows" using a jib, hydraulics, and sections. When the building is completed, the arms are dissassembled on the roof (they may be removed by another crane attached to a truck, or by other equipment on the roof?), and the process is then reversed (each section removed floor by floor by equipment inside the building). The jib is lowered as each section is removed, until there is nothing left, and the jib assembly is removed at ground level. I may need correction on this one though


How is wind power collected extracted removed from the environment?

By building a windmill to turn the wind power into electrical power