28 days - although the snake averages 1 foot per day, on the 28th day the 3 foot climb up will take it from the hole.
20 Days sounds like the obvious answer 16 days is the correct answer. The snail can go 5 feet each day... and slides back 4 each night. He will get to the 19th foot on the 15th DAY but will slide back to the 15 foot mark on the 15th NIGHT. He will climb 5 feet on the 16th day, reaching the 20 foot mark.
14 days (2 weeks)
No, the word day is a noun (time opposite of night, or period of 24 hours).
Assuming you mean "day" as "24-hour period" (i.e., a day and a night), just divide the number of hours by 24, to convert to days.
There are 24 hours in a day and night (this is actually an approximation but it is close enough that we all use it). Thus 144 hours = 144/24 = 6 days and nights.
28 days
50 days
The average gestation length for a snake is about 60 days (2 months)
20 Days sounds like the obvious answer 16 days is the correct answer. The snail can go 5 feet each day... and slides back 4 each night. He will get to the 19th foot on the 15th DAY but will slide back to the 15 foot mark on the 15th NIGHT. He will climb 5 feet on the 16th day, reaching the 20 foot mark.
35 days
I'm pretty sure that dark days is the second one or sequel to 30 days of night
65 days
A koala climbs a tree in minutes, not days. A baby koala must be at least nine months old before it will climb trees on its own.
The largest known species of snake on the planet is the Mother Snake that's a tropical snake. It is a huge snake. There were many snakes that were as long as a school bus and as heavy as a car in the prehistoric days.
It takes around 40 days to climb Mount Everest, allowing for the weather and aclimatization.
1 month and 23 days
Silverfish cannot climb smooth plastic. I caught one in a smooth plastic cup, and it was trapped for days. I don't know if they can climb textured plastic.