How much sand required to fill a plot considering compaction percentage?

In construction projects, the process of soil backfilling is crucial for preparing the site for further construction. This guide will outline the steps to calculate the required quantity of soil or sand and the number of trolleys (for material handling) or trucks needed to fill a designated plot. For instance: Given: Plot Length = 20 feet Plot Width = 10 feet Plot Area = Length x Width = 20 x 10 = 200 square feet Depth for filling the plot = 3 feet Volume of soil required to fill the plot = 200 x 3 = 600 cubic feet This calculated volume represents the loose state. The standards for the compaction process are taken into account for filling. The compaction rate indicates that 30% of the original uncompacted soil compacts, resulting in a final compacted soil volume of 70% of the original volume. This means that 1.0 in the original uncompacted state becomes 0.7 in the compacted state. To achieve a fully compacted soil volume of 1.0, we need to fill with 1/0.7 = 1.43 of uncompacted soil. Therefore, the quantity of soil/sand required for the compaction process to fill the plot is calculated as 600 x 1.43 = 857 cubic feet (1.43 is the conversion factor). Next, let's determine the necessary number of Material Handling Trolleys/Trucks: Assuming a trolley with a load capacity of 250 kilograms, capable of carrying 0.15625m3 = 5.51cft of soil (considering dry sand density as 1,600 kg/m3): For 1 cubic meter volume: Number of trolleys required = 857/5.51 = 156 trolleys. Considering a truck can carry 2.265 cubic meters / 80 cubic feet: Number of trucks required = 857/80 = 11 trucks. Please note: The capacity of trucks and carts might vary based on location and brand specifications. In this case, the standard size was not specified and was purchased according to the owner's requirements. However, the volume calculation remains consistent for these computations.

User Avatar

Rishi Gupta

Lvl 1
1y ago

What else can I help you with?

Related Questions

How much percentage is required to fill BIT SAT?

i think 75%


720 gallon container needs how much dirt?

To fill a 720-gallon container with dirt, you would need approximately 720 gallons of dirt, as the volume of the container dictates the amount required. However, if you're considering the density of the dirt, keep in mind that different types of soil may have varying weights and compaction rates. Generally, one cubic yard of dirt weighs around 1,000 to 1,200 pounds and equals about 27 gallons. Therefore, you would need around 26.67 cubic yards of dirt to fill a 720-gallon container.


Are the residents of the District of Columbia required to fill out the cesus?

Yes. Everyone is required by law to fill out the census, regardless of where you live.


What are some Examples for compaction?

Road compaction: Using heavy equipment like rollers or compactors to compress soil or asphalt to make a stable and durable road surface. Landfill compaction: Using specialized machinery to compress waste materials in a landfill to reduce volume and increase density to maximize space usage. Compaction in construction: Compacting soil or fill material before laying foundations to ensure stability and prevent settlement issues in buildings and structures.


How much percentage required in board exam to fill IIT-JEE form?

Till 2010 it was 60%, but from the 2011 season you must have atleast 70% marks to be eligible for IIT.


Difference between an engineered fill and a non-engineered fill material?

Engineered fill is soil or crushed stone that is compacted and used as fill. Engineered fill has much to do with the placement and compaction of the material you are using and not just the material itself.


How much dirt is needed to raise 5 acres 4 feet?

The soil type and amount of compaction will cause the amount to vary, but in general, using Med PI common fill with minimum compaction will require about 41,000 cubic yards to raise 5 acres 4' in elevation


Is it required to fill out a rental agreement form to rent a house?

Yes it is required to fill out a rental agreement form to rent a house. Without this agreement the landlord of the house will not let you rent the house unless you fill out the agreement.


Two Process responsible for changing sediments into sedimentary rocks is?

The two processes responsible for changing sediments into sedimentary rocks are compaction and cementation. Compaction occurs when the weight of the overlying layers presses down on the sediments, squeezing out water and air between them. Cementation happens when minerals dissolved in water fill in the spaces between the sediment particles, binding them together to form a solid rock.


How do you fill form 16?

You dont need to fill the Form 16. Your employer(company) will fill it up with all required information and give it to you.


What are the two processes to form sedimentary rock?

The two processes to form sedimentary rock are called compaction and cementation. Compaction occurs when sediments are buried and squeezed together by the weight of overlying deposits. Cementation happens when minerals in groundwater fill the spaces between sediment grains and bind them together.


What rocks are formed from the two step process of compaction and cementation.?

Rocks formed from the two-step process of compaction and cementation are called sedimentary rocks. During compaction, sediments are pressed together under pressure, reducing their volume. Cementation occurs when minerals precipitate from water and fill the spaces between the compacted sediments, binding them together. Common examples of sedimentary rocks include sandstone, limestone, and shale.