Want this question answered?
1:6 brick work sand consumption for 1 cubic meter = 9.71 cft 1 cubic meter brick work cement consumption = 1.32 bags 1.32/28.8= .0458 cubic meter .458*6 = .275 .275*35.31 =9.71 cft
Measure the average length, breadth and width of a brick. Calculate the volume of the brick as L*B*W cubic units Divide 1 by the volume of each brick, with appropriate adjustment for measurement units.
multiplyL xW x H to find the volume of 1 brick. Each measurement should be in cm. 1 cubic meter = (100 cm)3 = 1,000,000 cm3 now divide the volume of 1 brick INTO 1,000,000 that gives the number of bricks.
if tank hight is 7mtr and dia is 8mtrs how i will calculate in cubic meter
It depends on the size of the bricks.
28.60kn
The volume of gas in a cubic meter is one cubic meter. But perhaps that is not the real question?
Multiply by a million.
cubic meter
So you get the volume of one brick. Measure the length, width and height of one brick. Convert each to metres (/100 is you measured in centimetres). Now divide a cubic metre by the volume of 1 brick to get how many bricks would make a completely filled in cubic metre. Keep in mind, this method does not count any cement needed to secure the bricks
500 bricks
your a nob.