Length x width x depth in inches. Then x .00625 = tons
ASPHALT
Carpenters geometry to calculate angles of roofs and gables, as well as adding and multiplication when making measurements and ordering material.
Any number that you like: it depends how high the asphalt is stacked!
1 cubic meter asphalt=how much wieght
0.95
2.23 tons
hst
To calculate the amount of hot mix asphalt needed to cover an area 20x20 feet at a depth of 9 inches, first convert the thickness to feet (9 inches = 0.75 feet). Then calculate the volume of asphalt required by multiplying the area (20x20 = 400 square feet) by the thickness in feet (400 sq ft x 0.75 ft = 300 cubic feet). As asphalt is typically sold by weight, you will need to know the specific density of the hot mix asphalt in order to convert the volume to tons.
you can calculate like this:length*wideth*height*density.If you need more information, pls contact me: mould@sinomould.com
i dont know this nswer
you have to times it by 1000000000000000 and then divide be 15 then times it by 2
tonnage capacity is equal to area x shear strength of material. calculate area by multipying length and thickness of material.
1+1=2 2+2=4 3+3=hello i like tomatos
tonnage capacity is equal to area x shear strength of material. calculate area by multipying length and thickness of material.
what is the burthen tonnage
For steel, the formula is (material thickness) x (inches of cut) x 50,000.
Cold Mix Asphalt is a mixture of aggregate and asphalt. Cutback asphalt is a liquid asphalt. Cold Mix Asphalt is a mixture of Aggregate and Asphalt. The Asphalt is usually am emulsion asphalt or a cutback asphalt. An emulsion asphalt is asphalt cement blended with water. Cutback asphalt is asphalt cement blended with a fuel oil, kerosene, or a naptha. The water, fuel oil, kerosene or Naphta evaporates and leaves the asphalt.