answersLogoWhite

0


Best Answer

Length x width x depth in inches. Then x .00625 = tons

User Avatar

Wiki User

11y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: How do you calculate tonnage for ordering asphalt?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

Calculate tonnage for 272 squaremeter?

2.23 tons


How do you calculate annual ordering cost?

hst


How do you calculate the tonnage for injection mold?

you can calculate like this:length*wideth*height*density.If you need more information, pls contact me: mould@sinomould.com


How do you calculate hot mix asphalt by the ton to square feet covering an area 20x20 9 inches thick?

Calculate the volume of mix needed by multiplying 20x20x9. This gives cubic inches. Then divide that answer by 144 cubic inches per cubic foot, and you have the volume in cubic feet. A cubic foot of asphalt is a different weight depending on the weight of the rock in contains, but let's 158 pound of asphalt hotmix per cubic foot. Multiply the volume in cubic feet, above, by 158lbs, and you have the weight of mix per 20x20x9. Divide the answer by 2000 to convert to tons. Divide the tonnage by the weight per cubic feet calculated above in the second paragraph.


How do you calculate tonnage per kilometer per axle?

you have to times it by 1000000000000000 and then divide be 15 then times it by 2


What is the formula to calculate the Machine tonnage for Blanking the Sheet metal?

i dont know this nswer


How do you calculate the capacity of power press machine?

tonnage capacity is equal to area x shear strength of material. calculate area by multipying length and thickness of material.


How do you calculate the capacity of power-press machine?

tonnage capacity is equal to area x shear strength of material. calculate area by multipying length and thickness of material.


How do you calculate riveting tonnage?

1+1=2 2+2=4 3+3=hello i like tomatos


What is the difference between cold mix asphalt and cutback asphalt?

Cold Mix Asphalt is a mixture of aggregate and asphalt. Cutback asphalt is a liquid asphalt. Cold Mix Asphalt is a mixture of Aggregate and Asphalt. The Asphalt is usually am emulsion asphalt or a cutback asphalt. An emulsion asphalt is asphalt cement blended with water. Cutback asphalt is asphalt cement blended with a fuel oil, kerosene, or a naptha. The water, fuel oil, kerosene or Naphta evaporates and leaves the asphalt.


How do you calculate tonnage of forging press for the part to be forged?

For steel, the formula is (material thickness) x (inches of cut) x 50,000.


What is burthen tonnage?

what is the burthen tonnage