It depends on the length, width and depth of the ditch. Also, whether a spade or a JCB is to be used!
45 minutes
That my friend would take 11 people to dig the ditch. thanku pls. X Wouldn't it be 3 to 4 people? 3.5 to be exact.
That my friend would take 11 people to dig the ditch. thanku pls. X Wouldn't it be 3 to 4 people? 3.5 to be exact.
112 people are needed
Charleston Go dig a ditch and die!
get an Education
A trench made in the earth by digging, particularly a trench for draining wet land, for guarding or fencing inclosures, or for preventing an approach to a town or fortress. In the latter sense, it is called also a moat or a fosse., Any long, narrow receptacle for water on the surface of the earth., To dig a ditch or ditches in; to drain by a ditch or ditches; as, to ditch moist land., To surround with a ditch., To throw into a ditch; as, the engine was ditched and turned on its side., To dig a ditch or ditches.
they dug the ditchwith shovels made outof stone
To find out how many people are needed to dig the ditch in 12 days, we first calculate the total work needed in terms of person-days. The total work is 7 people × 8 days = 56 person-days. If the ditch needs to be dug in 12 days, we divide the total work by the number of days: 56 person-days ÷ 12 days = approximately 4.67 people. Since you can't have a fraction of a person, you would need at least 5 people to complete the work in 12 days.
If 7 people can dig a ditch in 8 days, that means the total work required is 7 people × 8 days = 56 person-days. To determine how many people are needed to complete the task in half a day (0.5 days), you would divide the total person-days by 0.5 days: 56 person-days ÷ 0.5 days = 112 people. Therefore, it would take 112 people to dig the ditch in half a day.
To find out how many people it would take to dig the ditch in half a day, we first calculate the total amount of work in "person-days." If 7 people can complete the work in 8 days, that amounts to 7 people × 8 days = 56 person-days. To complete the work in half a day, you would need 56 person-days ÷ 0.5 days = 112 people. Therefore, it would take 112 people to dig the ditch in half a day.
To dig; to open (the ground) as with a spade., To dig into; to penetrate; to trace out; to fathom., To dig or labor with a spade, or as with a spade; to labor as a drudge., A place dug; a pit; a ditch; a den; a cave.