0.74 cubic yards spread at 4 inches (1/9 of a yard) means 0.74 divided by (1/9) = 6.66 square yards, so the answer will depend on how wide the path is. So now you would have to divide 6.66 by the width of the path. This is about 5.5 square metres. So on a path 2 feet wide is would spread 9.99 yards, or 6.66 yards if 3 feet or a yard wide.
If it is 4 inches deep/thick, 2 cubic yards. If it is 6 inches deep/thick, 3 cubic yards.
40.1 cubic yards
You'll need 1.23 Cubic Yards.
It is about 166.67 cubic feet and you will need just over 6.17 cubic yards of concrete.
2.2222222201902215 cubic yards
Three acres three inches deep is 403.33 cubic yards.
62/3 cubic yards for every 1-foot deep. 5 cubic yards for every 9-inches deep. 31/3 cubic yards for every 6-inches deep. 5/9 cubic yard for every 1-inch deep.
6 inches = 1/6 yards. So 70 sq yards * 6 inches = 70*1/6 cubic yards = 11.66... cubic yards.
If it is 4 inches deep/thick, 2 cubic yards. If it is 6 inches deep/thick, 3 cubic yards.
24 cubic feet = 0.89 cubic yards
13.1 cubic yards, approx.
1.851852 cubic yards
3,456 cubic yd.
40.1 cubic yards
1 cubic yard will cover 15 square yards at 3 inches deep.
15.833... [cubic] yards.
Usually a cubic yard will cover 15 square yards at 3 inches deep so I would reckon on 22 cubic yards. Hold on that I've got that wrong it's 2 cubic yards .Sorry.