40.1 cubic yards
8 square yards
39.1116 cubic yards
One square yard is nine square feet, so 27 square feet is equivalent to 3 square yards. So 3 yards of concrete will cover 27 square feet.
To calculate the amount of concrete needed for a 715 square foot area with a thickness of 4 inches, first convert the thickness from inches to feet: 4 inches is 1/3 of a foot. Next, multiply the area by the thickness: 715 sq ft × (1/3 ft) = approximately 238.33 cubic feet. Since concrete is typically ordered in cubic yards, convert cubic feet to cubic yards by dividing by 27, which gives about 8.81 cubic yards of concrete needed.
It should be a little over 19 yards.
For 576 square feet at a depth of 4 inches, you will need 7.11 cubic yards.
8 square yards
To my knowledge, concrete is measured in cubic yards. you would convert your measurements to yards 2000 sq ft is about 222.22 sq yards 4 inches is about 0.11 yards multiply to get volume, about 24.7 cu yards
1000 square feet/9 = 111.1 square yards of concrete 6 inches thick. This is the same as 111.1/4.5 = 24.7 cubic yards of concrete.
how may yards of concrete are needed for a floor 24 x 25 feet?
39.1116 cubic yards
One square yard is nine square feet, so 27 square feet is equivalent to 3 square yards. So 3 yards of concrete will cover 27 square feet.
How thick? Gotta have thickness to calculate cubic yards.
123.44 cubic yards
At a poured depth of 4 inches, you will need 4.94 cubic yards.
If you multiply inches times inches, you get square inches. You can convert that to square yards, but not to yards.
To calculate the amount of concrete needed for a 715 square foot area with a thickness of 4 inches, first convert the thickness from inches to feet: 4 inches is 1/3 of a foot. Next, multiply the area by the thickness: 715 sq ft × (1/3 ft) = approximately 238.33 cubic feet. Since concrete is typically ordered in cubic yards, convert cubic feet to cubic yards by dividing by 27, which gives about 8.81 cubic yards of concrete needed.