answersLogoWhite

0


Best Answer

The electrical code does not allow wires smaller that #2 to be paralleled to a connected load.

User Avatar

Wiki User

13y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: How many 10 AWG electrical wire in parallel to take 100 amp load?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Continue Learning about Natural Sciences

How many strings of LED Christmas Lights can be plugged into one outlet and is it more than with the old incandescent lights?

you need to work out the total load of all the strings,then what is the safe load that the socket can take


How long does it take to set up a performance by Trans-Siberian Orchestra?

I have set up many concerts including TSO, and it takes 8 to 10 hours for load-in, depending on the arena, and 2 1/2 to 3 hours for load-out.


What is spreading process?

You take a slice of bread, load a knife with some butter and spread it over the bread.


How many amps per phase would a machine rated at 460 amps over three phases take?

It depends on the internal circuit of the machine. If it is star operated its full load current will be same as rated current. If it is Delta operated its full load per phase current will be as given below : Phase current = Line Current / 1.732


How do you increase your single phase supply from 50 to 100 amps?

Put a second, identical unit right next to it and run them in parallel. If your single phase supply is designed to produce X volts and Y amps, you cannot produce more than Y amps with it without burning it up. <<>> Check with your electrical inspection department before doing the above fix. There is a new main breaker to take into account that has to be changed out from a 50 amp breaker to a 100 amp breaker. This process will involve the disconnection from the utility company and a reconnection which they will not do unless an electrical permit has been taken out and an inspection made. To do this job yourself you have to know wire sizes, ampacity of wires and proper electrical workmanship. Such a project should be left to a licensed electrical contractor to take out the proper permits and call for proper inspections. By taking this route it will leave you confident that if any mishaps happen to the installation down the road your insurance company will be behind you 100%.

Related questions

What electrical connection will continue to work even if you take away one bulb?

parallel


Why does your take so long to load?

too many ads.


How many paths can a current take in a parallel circuit?

At least two.


Why does your site take so long to load?

too many ads.


How is an multimeter connected to take a measure?

Multimetres are generaly used to measure the following quantities. Voltage: multimeter is connected in parallel with the Load; Current: multimeter is connected in series with Load; Resistance: the resistor must be taken out of the circuit first, then, the probes from the multimeter are connected across the resistor,


When was Take a Load Off created?

Take a Load Off was created in 2010-06.


How many bits Google Chrome uses to load apage?

It depends on the size of the page to be opened. A page if larger in size will take longer to load.


How many paths can electricity take in a parallel circuites have a battery and three light bulbs?

If each lamp is connected in parallel, then there are three 'paths' that draw current from the supply.


How many parts can currents take in series and parallel circuits?

Series circuit: one path. Parallel circuit: One path for each branch (two or more).


In webkinz how many rooms can you have?

You can have as many rooms as you want. If you add too many your house will take forever to load so be aware!


How many gallons of water does a high efficient front load washer take?

20 gallons


What does the idiom take a load off means?

The image is of you "taking a load off" of your feet, which are holding you up. If you take a load off your feet, you'd sit down. This is most commonly used as an invitation to sit, as in "Come on in, take a load off."