The electrical code does not allow wires smaller that #2 to be paralleled to a connected load.
you need to work out the total load of all the strings,then what is the safe load that the socket can take
I have set up many concerts including TSO, and it takes 8 to 10 hours for load-in, depending on the arena, and 2 1/2 to 3 hours for load-out.
You take a slice of bread, load a knife with some butter and spread it over the bread.
It depends on the internal circuit of the machine. If it is star operated its full load current will be same as rated current. If it is Delta operated its full load per phase current will be as given below : Phase current = Line Current / 1.732
Put a second, identical unit right next to it and run them in parallel. If your single phase supply is designed to produce X volts and Y amps, you cannot produce more than Y amps with it without burning it up. <<>> Check with your electrical inspection department before doing the above fix. There is a new main breaker to take into account that has to be changed out from a 50 amp breaker to a 100 amp breaker. This process will involve the disconnection from the utility company and a reconnection which they will not do unless an electrical permit has been taken out and an inspection made. To do this job yourself you have to know wire sizes, ampacity of wires and proper electrical workmanship. Such a project should be left to a licensed electrical contractor to take out the proper permits and call for proper inspections. By taking this route it will leave you confident that if any mishaps happen to the installation down the road your insurance company will be behind you 100%.
parallel
too many ads.
At least two.
too many ads.
Multimetres are generaly used to measure the following quantities. Voltage: multimeter is connected in parallel with the Load; Current: multimeter is connected in series with Load; Resistance: the resistor must be taken out of the circuit first, then, the probes from the multimeter are connected across the resistor,
Take a Load Off was created in 2010-06.
It depends on the size of the page to be opened. A page if larger in size will take longer to load.
If each lamp is connected in parallel, then there are three 'paths' that draw current from the supply.
Series circuit: one path. Parallel circuit: One path for each branch (two or more).
You can have as many rooms as you want. If you add too many your house will take forever to load so be aware!
20 gallons
The image is of you "taking a load off" of your feet, which are holding you up. If you take a load off your feet, you'd sit down. This is most commonly used as an invitation to sit, as in "Come on in, take a load off."