1 cubic metre of m25 concrete = 2 400 kg, so 2 400 / 50 = 48 bags
average of 0.12tons of rebars per cubic meter of concrete.
1 Cubic Meter of sand can be split up in a number of ways. It depends on the size of the bags being used to hold it.
You will need about 7 25kg bags of cement.
This may help or not. A cubic meter of concrete weighs 1(one) tonne Metric. If you convert 1 tonne to pounds and a cubic meter to cubic yards, then, you have it. 1cubic meter=1.30795037 cubic yards. 1tonne=0.98420625 of a ton..1ton=2240pounds. Mate, I hope that's right. If not it'll give you something to go on with.
Your 1 cubic meter = 1.30795 cubic yards.
108
average of 0.12tons of rebars per cubic meter of concrete.
about 60 60lb bags
1 Cubic Meter of sand can be split up in a number of ways. It depends on the size of the bags being used to hold it.
1.8 Cubic yards of concrete is 48.6 cubic feet. Each 80lb bag of concrete is .6 cubic feet. Therefore, you would need 81 bags. Hope that helps. GEO
Hi, you'd need roughly 2900 bags of 80Lbs. bags. (would actually make 64.4 Yds cubed)
The answer will depend on how big (or small) the bags of sand are!
it is 2400 kg
You will need about 7 25kg bags of cement.
10.94 bags
Depends what is in the bags..... Also cubic meter, yard, inch, etc.
10