It depends on how deep the concrete. 600 sq ft at 6 inch deep is 300 cu ft = 11.1 yards. 12 inch deep is 22,2 yards; 4 inch deep is 5.5 yards
123.44 cubic yards
If the slab is the standard 4" deep, you will need at least 8.89 cubic yards.
none, a hole has nothing in it
You need 82/3 [cubic] yards for every foot deep that it has to be.
You will need 0.56 cubic yards of concrete.
.99 yds
40.1 cubic yards
Approx 64 cubic yards.
3880 cubic yards
It depends on how deep the concrete. 600 sq ft at 6 inch deep is 300 cu ft = 11.1 yards. 12 inch deep is 22,2 yards; 4 inch deep is 5.5 yards
about 5 yards if your slab is 4" deep
1.19 Cubic Yards
123.44 cubic yards
How deep? 1 inch will take .7 yards
You'll need 1.23 Cubic Yards.
2.2 Yards