answersLogoWhite

0

21237.634944

User Avatar

Wiki User

14y ago

What else can I help you with?

Related Questions

How many cubic centimeters in a cubic yard?

764,600cc per cubic yard.


How many cubic feet would it take to fill a cubic yard?

27


How many teaspoons would it take to fill a cubic yard?

1 cubic yard = 155 116.052 US teaspoons.


How many 6x8x16 block will a yard of concrete fill?

A standard 6x8x16 concrete block has a volume of 0.5 cubic feet. Since there are 27 cubic feet in a cubic yard, you can calculate the number of blocks that a yard of concrete will fill by dividing 27 by 0.5. This means that a yard of concrete can fill approximately 54 of these blocks.


How many 32 gallon garbage cans will it take to fill 1 yard of mulch?

One cubic yard is equivalent to 27 cubic feet. A 32-gallon garbage can holds about 4.3 cubic feet. To find out how many cans are needed to fill one yard of mulch, divide 27 cubic feet by 4.3 cubic feet per can, which equals approximately 6.3. Therefore, it will take about 7 (rounding up) 32-gallon garbage cans to fill one yard of mulch.


How much top soil does it take to fill a cubic yard?

Well.....A cubic yard is a measure of volume, so the answer is....it takes a cubic yard (IE it would fill a box that was one yard wide by one yard long by one yard high. If you follow this link (http://www.rexius.com/faq.html) you will see a cubic yard of soil typically weighs around 1300 to 1600 lbs. To give you an alternate form of measurement, you are looking for 27 cu ft to fill a cubic yard of topsoil.


What is a yard of concrete?

Definition of the amount of concrete that (by volume) will fill on cubic yard of space.


How many 80lb bags of concrete are in a yard?

There are approximately 27 cubic feet in a cubic yard, and an 80-pound bag of concrete typically yields about 0.6 cubic feet. Therefore, to fill one cubic yard, you would need about 45 bags of 80-pound concrete.


How many 60lb bags of cement in yard of cement?

There are 27 cubic feet in a cubic yard, and a 60-pound bag of cement typically yields about 0.45 cubic feet when mixed. To fill one cubic yard, you would need approximately 60 bags of 60-pound cement.


How many cubic feet will a 80lb bag of readymix quickcrete fill?

80# bags are 0.6 cubic feet and it takes 41 to make a cubic yard. In that case, 60# bags must be 0.45 cubic feet and it would take 55 to make a cubic yard.


How many cubic feet are there in a cubic yard?

There are 27 cubic feet in one cubic yard.


How many cubic meter is a cubic yard?

1 cubic yard is about 0.7646 cubic meters.