A lot! The US Energy Information Administration says that the Vermont Yankee has a capacity of 620 megawatts during the summer. To generate 5 megawatts of solar power requires a solar farm about 30-35 acres large. Since 620 divided by 5 is 124, you would need 124 x 30 acres of solar plants. That comes to a total of 3,720 acres! One acre is 43,560 square feet. This means that it would require 162,043,200 square feet of solar farm to replace the facility which takes up less than one acre. And that's based on the low estimate.
If you are looking for alternatives to the Vermont Yankee, I suggest you look elsewhere, because solar won't do it in Vermont.
i needed the answer for this question for my crossword and i soon found out the answer was 'NUCLEAR'.
A brown dwarf is not massive enough to create the heat and pressure at its core needed for nuclear fusion.
how much fuel is needed to get to the moon in a rocket
They belived that the sun needed human blood so that is why they sacrificed it
3 and a half moons are needed to make the earth!(:
About 500, when the wind is blowing
Neutron particle is needed to begin nuclear chain reaction.
turbins and nuclear rods
more than needed????
If enough nuclear plants are built, yes
Because plutonium is needed for nuclear weapons and nuclear fuels.
the nuclear binding energy
The nuclear fuel either loaded in adedicatednuclear reactor or in an atomic bomb
No, it was not needed, but it was an available weapon, and its use probably saved human lives.
Uranium makes for an excellent element for nuclear fission. Hydrogen is most commonly used for nuclear fusion.
Uranium ore.
nuclear fuelcoolantneutron moderator (if needed)control elementsshieldingmeasurement instrumentationemergency systemssupport structures