1.33 cubic yards, but that should be rounded up to 1.5 cubic yards. I would recommend going to 4 inches and if you are in a colder climate ordering that as a 4,000 psi mix, with air entrainment, set at a 6 inch slump at the plant using a low range water reducer. If you want to play with the thickness, then there is a related link to a calculator below.
4.074 cubic yards for every foot the slab is thick.
If the slab is the standard 4" deep, you will need at least 8.89 cubic yards.
You will need a minimum of 2.96 cubic yards.
You can't express a volume of concrete in yards.
You need to specify the slab's width and the length as well.
how many yards of concrete will i need to do a 20 x20 x4 slab
1.85 cubic yards.
2.96 Cubic Yards
3.56 Cubic Yards
You will need 27.6 cubic yards of cement.
40 yards.
37.03 yards
Approx 21 cu yds.
Assuming you need a slab 25 feet x 32 feet x 4" you would need 10 yards of concrete. 25 x 32 x .33 / 27 = 9.7 cubic yards
3.95 cubic yards of cement are needed for a slab that size.
A 40x60x6in slab requires 44.44 cubic yards of cement.
4.074 cubic yards for every foot the slab is thick.