That depends on the power factor on the line, which in turn
depends on what kind of machinery is using the 55 KW.
The run capacitor is used when the load is functional while the start capacitor is used to produce the initial torque to drive the load.
yes
When there is no load on a circuit with a capacitor in the line, no current will pass. The capacitor, if charged, will remain charged until a load is put on to the circuit at which time it will discharge its designed output voltage.
It depends on the power factor of the load, but for a load power factor of 0.7 on a 2000 kVA transformer the real power and reactive power are both 1400 kilo (watts and VAR). So a 1400 kVAR capacitor on the load would restore the power factor to 1, allowing 2000 kW to be drawn instead of only 1400 kW.
capacitor bank
Negative.
in output is pulsetting voltage remove the pulses to use the capacitor this passes the pure voltage to the load
A capacitor discharges when it releases the stored electrical energy it has accumulated. This typically happens when the capacitor is connected to a circuit or load that allows the energy to flow out of the capacitor.
You cannot use a capacitor as a 'power saver' or, more accurately, 'energy saver'! A capacitor may improve the power-factor of a load, and this may reduce the value of its load current, but this does not reduce the energy consumed by the load. For a residence, a so-called 'power save' capacitor is nothing more than a rip-off.
use more impedense load and use suitable capacitor bank with the load.
Yes, it will be less stressed. Yes you can. But no, it won't be stresssed. If it has the same load as the 55A one it will be more lightly loaded.
The KVAR rating of a capacitor bank is typically determined by the reactive power (KVAR) demand of the system that needs to be compensated. This can be calculated by conducting a power factor study or analysis to determine the required amount of capacitive reactive power to bring the power factor to the desired level. The KVAR rating of the capacitor bank should be selected to meet this calculated KVAR demand.