answersLogoWhite

0

2 inches = 1/6 foot

27 cubic feet = 1 cubic yard

Volume of the hole = (15' x 7' x 1/6-ft) = 17.5 cubic feet = 0.648 cubic yard (rounded)

User Avatar

Wiki User

13y ago

What else can I help you with?

Related Questions

How much concrete will you need to fill a hole that is 18 inches around and 24 inches deep?

about 432 cubic inches


If you drill a hole 40 feet deep by 24 inches in diameter how much concrete will it take to fill it in?

18.6240 yd³


How many gallons of water fill a 4ft deep x 15ft round pool?

5,287.7 gallons of water.


How much concrete does it take to fill a hole 25 ft deep and 48 inches diameter hole?

To calculate the volume of concrete needed to fill a hole that is 25 feet deep and 48 inches in diameter, first convert the diameter to feet (48 inches = 4 feet). The radius is then 2 feet. The volume ( V ) of a cylinder is calculated using the formula ( V = \pi r^2 h ). Plugging in the values: ( V = \pi (2^2)(25) \approx 157.08 ) cubic feet. Therefore, it would take approximately 157.08 cubic feet of concrete to fill the hole.


How much concrete is needed to fill a hole 12'' in diameter and 24 inches deep?

To calculate the volume of concrete needed to fill a hole with a diameter of 12 inches and a depth of 24 inches, first convert the dimensions to feet: the diameter is 1 foot and the depth is 2 feet. The radius is 0.5 feet. Using the formula for the volume of a cylinder (V = πr²h), the volume is approximately 3.14 × (0.5)² × 2 = 1.57 cubic feet. Therefore, you need about 1.57 cubic feet of concrete to fill the hole.


How much concrete to fill a 6 inch wide hole by 36 inches deep?

To determine the amount of concrete needed to fill a 6-inch wide hole that is 36 inches deep, first calculate the volume of the hole. The hole is cylindrical, so use the formula for the volume of a cylinder: Volume = πr²h. The radius (r) is half the diameter, which is 3 inches, and the height (h) is 36 inches. Thus, the volume is approximately 3.14 x (3 in)² x (36 in) ≈ 339.29 cubic inches, or about 0.197 cubic feet.


How to install a mailbox post correctly?

To install a mailbox post correctly, dig a hole at least 24 inches deep, place the post in the hole, and fill it with concrete. Make sure the post is level and allow the concrete to set before attaching the mailbox.


How many yards of sand are need to fill area 115 inches by 67 by 2.5 inches deep?

.21 yards of sand will fill an area 115 inches by 67 inches to a depth of 2.5 inches.


What is the recommended method for installing a concrete footing for a 6x6 post?

The recommended method for installing a concrete footing for a 6x6 post is to dig a hole that is at least 12 inches in diameter and 24 inches deep. Place a cardboard tube form in the hole and fill it with concrete, making sure it is level. Insert a post anchor into the wet concrete and allow it to cure for at least 24 hours before attaching the post.


How much concrete to fill 18x14ft x2 in deep?

42 cubic feet or 1.56 yards.


How much concrete do you need to fill a 12 in hole 18 in deep?

To calculate the amount of concrete needed to fill a 12-inch diameter hole that is 18 inches deep, first convert the measurements to feet: the diameter is 1 foot and the depth is 1.5 feet. The volume of a cylinder is given by the formula V = πr²h. The radius (r) is 0.5 feet, so the volume is approximately π(0.5)²(1.5) = about 1.18 cubic feet. Thus, you would need roughly 1.18 cubic feet of concrete to fill the hole.


How much sand will fill a twelve foot circle six inches deep?

22/7x6x6x6 cubic inches