1 foot = 12 inches
20 ft * 7 ft can be expressed as
240 inches * 84 inches, then
240 in * 84 in * 2 in = 40320 inches cubed
or 3360 cubic feet
The answer depends on the depth to which the area is covered.
This is kind of tricky, but here are the basics: Volume is the surface area of the cylinder multiplied by the depth of the water. Do not mix feet and inches, convert all dimensions to feet or inches, depending on the application. To calculate the surface area, measure the inside diameter of the cylinder, divide the diameter by 2 and then multiply by Pi (3.1416). Multiply the surface area by the depth of the water and use following information for conversion: water is 231 cubic inches per gallon or 7.481 gallons per cubic foot.
If you use a depth of 3 inches, that area will be about 16.2 cubic yards (around 20.785 tons) of gravel.
A cubic measurement is a volume measurement. To calculate volume, multiply Area x Height (or Depth).
First, convert acres to square feet . . . 43,560 sq ft. Then, convert 43,560 sq ft to sq inches . . . 43560 x 144 = 6,272,640 sq inches Then multiply that area by the 1 inch depth . . . 6,272,640 x 1 = 6,272,640 cubic inches of volume.
To determine how much area 76.9 cubic feet covers at a depth of 12 inches, first convert the depth to feet: 12 inches is 1 foot. Then, divide the total volume by the depth: 76.9 cubic feet ÷ 1 foot = 76.9 square feet. Therefore, 76.9 cubic feet will cover an area of 76.9 square feet at a depth of 12 inches.
One cubic meter of cement at a depth of 6 inches (approximately 0.1524 meters) will cover an area of about 6.56 square meters. This is calculated by dividing the volume (1 cubic meter) by the depth in meters (0.1524), giving you the coverage area. Therefore, 1 cubic meter of cement at this depth can effectively cover a space of about 6.56 square meters.
1 cubic yard of rock = 27 cubic feet of rock. 27 cubic feet of rock @ 6" (1/2 of foot) = 27/(1/2) = 54 sf
To calculate the amount of soil needed, you multiply the area by the desired depth. In this case, you have 9300 square feet and want a depth of 12 inches. Convert the depth to feet (12 inches = 1 foot) and multiply: 9300 square feet x 1 foot = 9300 cubic feet of soil. So, you need 9300 cubic feet of soil to cover the area with a depth of 12 inches.
To calculate the amount of DG (decomposed granite) needed, first convert the depth from inches to feet: 3 inches is 0.25 feet. Then, multiply the area by the depth: 600 sq ft × 0.25 ft = 150 cubic feet. Since DG is typically sold by the cubic yard, divide by 27 (the number of cubic feet in a cubic yard): 150 cubic feet ÷ 27 ≈ 5.56 cubic yards. Therefore, you will need approximately 5.6 cubic yards of DG to cover 600 square feet at a depth of 3 inches.
1 (cubic yard) = 46 656 cubic inchesIf the depth is 2 inches then the area it will cover is 46656/2 square inches = 23,328 square inches. Convert 23,328 square inches to square yards23 328 (square inches) = 18 square yards
To cover 144 sq ft with soil to a depth of 6 inches, you would need 72 cubic feet of soil. This can be calculated by multiplying the area (144 sq ft) by the desired depth (6/12 ft) to get the volume in cubic feet.
To cover 7,500 square feet to a depth of 4 inches, you first convert the depth to feet, which is 4 inches ÷ 12 inches/foot = 0.33 feet. Then, multiply the area by the depth: 7,500 sq ft × 0.33 ft = 2,475 cubic feet of sand. If you need the amount in cubic yards, divide by 27 (since there are 27 cubic feet in a cubic yard), resulting in approximately 91.67 cubic yards of sand.
There are 4,014,489,600 cubic inches in one square mile. This calculation is derived by converting one square mile to cubic inches, which involves multiplying the area in square inches by the depth in inches.
Nope - cubic inches represents volume. Squareinches represents area.
To determine how much gravel you need to cover a 2,400 sq ft area, you first need to decide on the desired depth of gravel. For example, if you want a depth of 3 inches, you would convert that depth to feet (3 inches = 0.25 feet) and then multiply the area by the depth: 2,400 sq ft x 0.25 ft = 600 cubic feet. Since gravel is typically sold by the cubic yard, you'll convert cubic feet to cubic yards by dividing by 27 (1 cubic yard = 27 cubic feet), resulting in approximately 22.2 cubic yards of gravel needed.
Area x depth = volume Both numbers must be in feet or inches. I chose feet 6 inches = .5 feet 2400 x .5 1200 cubic feet one cubic foot = 0.0283168466 cubic meters So: 1200 x 0.0283168466 = 33.98 1200 cubic feet = about 34 cubic meters