(512 (sq ft)) * 2 in = 2.41637091 m3
or in other words...
2.41637091 (cubic meters) = 85.3333334 cubic feetyou need 6 cubic feet of material, assuming you want a flush surface
It depends on how deep you want it
Assuming the units for the three measures are the same, you need 14400 cubic units.
11,923,200 sq in. of sand.
You need to specify how deep the area is to answer the question; this is a volume problem. Please ask again
You would need about 13 cu yards or about 15 tons.
That depends on how deep you want the top soil! 5' X 8' = 40 square feet. If you want it 1' deep you would need 40 Cubic Feet, 3" deep you would need 10 cubic feet of top soil.
You will need 1500 cubic feet.
You will need about 463 cubic yards (around 594 tons) of gravel for this area.
That depends how deep you want your covering. You'll need a volume of 256 x depth_in_feet cubic feet of dirt to cover the area of 8 ft by 32 ft.
It depends on how deep you want the bark to be, the recommended depth is 2 - 4 inches (5 - 10cm) thus at 10cm deep you'd need 201m3 to cover 2006m2
The area that 60lbs of sand will cover is dependant on how deep you want it.æ One hundred pounds of sand equal 1 cubic foot.Your customer service rep at your local storeæcan calculate how much you will need.