Job takes 60 mandays + 80 boy days or 52 mandays + 96 boydays.
Thus 8 man days = 16 boydays so 2 boydays = 1 manday.
This means that 7 mandays and 10 boydays is equivalent to 12 mandays.
The job requires 60 + 80/2 ie 100 mandays so it would require 8 and a third days.
In 4 days!
10 kindly do the steps
It take 15 days to get the WOrk permit
two to four days
6 boys and 15 girls can do a piece of work in 4 days while 12 boys 3 girls do the same work in 5 days. In how many days will 1 boy and 1 girl do the work seperately ?
4.4 days of work
it may take 30 days time
About 10 days.
In one day 1 man does 1/200th of the work, In one day 1 boy does 1/300th of the work, so in one day 6 men and 11 boys do (6/200 + 11/300) of the work, ie (18 + 22)/600 or 1/15th so between them they take 15 days.
90 days after the petition is filed with USCIS
Antibiotics can take 2 - 3 days to begin working. They take time to build a level in your system.
it generally take 2 to 3 days for mail to arrive!