answersLogoWhite

0

Job takes 60 mandays + 80 boy days or 52 mandays + 96 boydays.

Thus 8 man days = 16 boydays so 2 boydays = 1 manday.

This means that 7 mandays and 10 boydays is equivalent to 12 mandays.

The job requires 60 + 80/2 ie 100 mandays so it would require 8 and a third days.

User Avatar

Wiki User

15y ago

What else can I help you with?

Related Questions

13If 9 men and 12 boys can do a piece of work in 4 days and 4 men and 16 boys can do the same piece of work in 6 dayshow long will 6 men and 24 boys take to complete the same work?

In 4 days!


If 3 men or 6 boys can do a piece of work in 20 days then how many days with 6 men and 8 boys take to do the same work?

10 kindly do the steps


How long will take t provide work visa in brussels?

It take 15 days to get the WOrk permit


How long does it take centrine to work in dogs?

two to four days


6 tractors take 11 days to collect the harvest how long would it take 15 tractors to do the same amount of work?

4.4 days of work


If 3 men and 6 boys can do a piece of work in 20 days then how many days with 6 men and 8 boys take to do the same work?

To solve the problem, first determine the work done by 3 men and 6 boys in one day. If 3 men and 6 boys complete the work in 20 days, their combined work rate is 1/20 of the work per day. Let the work rate of one man be ( m ) and one boy be ( b ). Thus, ( 3m + 6b = \frac{1}{20} ). Now, for 6 men and 8 boys, the work rate is ( 6m + 8b ). To find how long they will take to complete the same work, calculate the ratio of the work rates. The new work rate simplifies to ( 2(3m + 4b) ). Using the previous equation, we can find that ( 3m + 6b ) is half of ( 3m + 4b ) since ( 3m + 6b = \frac{1}{20} ) implies ( 3m + 4b ) is also constant. Hence, the time taken by 6 men and 8 boys to complete the work is 12 days.


How long does it take to receive a work permit in botswana?

it may take 30 days time


Back in the day why did the boys have to work and not the girls in 2000 bc?

6 boys and 15 girls can do a piece of work in 4 days while 12 boys 3 girls do the same work in 5 days. In how many days will 1 boy and 1 girl do the work seperately ?


How long does it take valbazen wormer to work on pygmy goats?

About 10 days.


8 men or 12 boys can do a piece of work in 25 days in how many days can 6 men and 11 boys do it?

In one day 1 man does 1/200th of the work, In one day 1 boy does 1/300th of the work, so in one day 6 men and 11 boys do (6/200 + 11/300) of the work, ie (18 + 22)/600 or 1/15th so between them they take 15 days.


How long does it take to get work permit after marriage?

90 days after the petition is filed with USCIS


How long do it take for penicillin to work for a male?

Antibiotics can take 2 - 3 days to begin working. They take time to build a level in your system.