8 men lay 100 feet in 2 days.

The same 8 men lay 50 feet per day.

Each man lays 50/8 feet per day.

So 3 men lay 150/8 feet per day.

It takes them 8 days to lay 150 feet.

User Avatar

Wiki User

14y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: If eight men take two days to lay 100 feet how long will three men take to lay 150 feet?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

How long does a period usually last for?

Three to eight days is concidered normal.


What is liner feet on a countertop?

Linear feet is the length. An eight foot long rope has eight linear feet.


How long were japan and USA fighting in world war 2?

Three years, eight months, and a few days.


What is the average childhood lenght for dolphins?

When they are first born a baby dolphin is approximately three feet long. By adulthood many species of dolphins measure in at about eight feet in length.


How many feet long is an elephant?

Eight feet4 feet


What is the volume of a cylinder eight inches wide and five feet long?

The volume of a cylinder eight inches wide and five feet long is: 3,016 cubic inches or 1.745 cubic feet.


How long is eight weeks?

56 days


Is a sky cable a cord which is at least 3 ft long?

A sky cable cord does have a cord that is at least three feet long. In fact the cable cord lengths can very. they can reach up to eight feet long, which is alot in terms of cable cords.


When was Apollo eleven launched and how long was it in space?

Apollo 11 was launched on 16/7/1969, and lasted eight days and three hours.


Is a meter three feet long?

Yes a meter is three feet long all around. a meter is 3ft. 3in.


How long can the animal jaguar grow to?

Up to eight feet.


How long is eight days in minutes?

11,520 minutes.