116 parts in 8 hours is 8/116 hours for each part.

So 1276 parts would take in 1276*8/116 hours = 88 hours.

User Avatar

Wiki User

14y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: The machinist could produce 116 parts in 8 hours how many hours would it take to produce 1276 parts?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

How do you know rod brearing size on a 3800?

It is listed in the parts manual, Repair manual and Machinist's manual


How long does it take to become a machinist?

Most machinists attend community college, which takes two years. Then you need to find someone who will hire a newly-minted machinist and let them machine parts for a few years. So...to be a machinist takes two years, to be a good one probably takes five.


Who makes and can you get parts for a Revelation Shotgun model R312AB?

You can try e-gunparts.com or have a machinist/gun smith make them.


Railroad machinist Job descriptions?

Repair and replace any and all mechanical parts on a locomotive. This includes diesel engine power assembly parts, or the entire engine. Also, main generators, air compressors, auxillary generators , traction motors, truck frame parts, wheel assemblies, radiators, air equipment, air brake portions, carbody components,etc. A "Journeyman Machinist" serves a 4 year apprenticeship before obtaining his journeyman's card.


What parts if an atom produce magnitism?

The parts of an atom which produce magnetism are the electrons.


What do female parts of a flower produce?

they produce seeds


Why do manufacturing processes produce parts with a wide range of tolerance?

why do manufacturing processes produce parts with wide range of tolerance


Why was Charles Babbage unable to build his machine?

He got the idea for a better machine the Analytical Engine, which would have been fully general purpose.When he did not deliver a working Difference Engine as originally promised, Parliament withdrew all his funding.His machinist threatened to take all the tooling and parts he had made to make up for late payments for work already done that Babbage owed him. The machinist quit.Admittedly on his own Babbage did complete the design of the Analytical Engine and an improved Difference Engine that was much smaller and needed only about one fourth the parts, but with no way to get funding and no machinist he could not very well build them.Or to oversimplify it, breach of contract caused by Babbage's inability to stop engineering better products and get the one he had into actual production.


Do different parts of the country produce different amounts of rubbish?

yes different parts of the country produce different amounts of rubbish


How long of a drive is it from Waterford to Kerry?

It will depend on what parts of Waterford and Kerry you are driving between. It would be at least 2 hours, and depending on where you are going, it could be up to 3 hours.


What parts of a suspension system could produce squeaks?

The positional sensor can produce squeaking in a car. The shocks can also cause squeaking in a suspension system of a car as well. Springs under the engine are known for this, too.


What parts that produce energy for the cell?

Mitochondria.