Want this question answered?
Smaller
The top point
false
I assume you mean the curve of length against applied force (or mass) for a wire. The beginning part of the curve should be a straight line, and this is where the deformation is elastic. When the substance passes its elastic limit, the line starts to curve up.
You don't. An equation with two variables can be graphed as a line or a curve on x-y coordinates. When you do that, EVERY point on the line or curve satisfies the equation. You can't 'solve' it ... i.e. come up with unique values for 'x' and 'y' ... until you have another equation. It represents another line or curve on the graph, and the 'solution' represents the point (or points) where the graphs of the two equations intersect.
The "bell curve" of anything, with the peak of the curve supposedly at a score of 100.
the IS curve represents the combination of interest rates and outputs that put the goods market in equilibrium
A bell curve is a graph that depicts a large rounded peak tapering away at each end of normal distribution. A bell curve is a mathematical concept with the curve concentrated in the center.
Use those speacial reading graphs You should have a hydrograph to look at. Look at the curve on this graph, the highest point on this curve is the peak flow. It cannot be calculated, just read off a graph. Peak Flow = Tidal Volume x 60 / I-time
when we look at the curve ,, we can see that before the peak point curve has greater slope as compared to the slope after the peak point .. the reason is PL is given as I^2RL ,,, current is a squared term here . before peak point current is greater so overall change in power is much greater but after peak point RL is greater and current is less now the load resistance is not a squared term... so slope will be less. therefore the curve is not symetrical
It peaks in the visible spectrum.
That is about where the peak of its blackbody radiation curve is, as determined by the photosphere temperature.
Curve that represents the curve between cost vs time or resources vs time in primavera planning software... Since it looks like "s" its called s-curve...
Load duration curve represents re-arrangement of all load elements of chronological load curve in the order of descending magnitude. It illustrates the relationship between generating capacity requirements and capacity utilization.The area under the load duration curve and the corresponding chronological load curve is equal and represents total energy delivered by the generation station.
Smaller
The slope of the curve.
That would be an exponential decay curve or negative growth curve.