== ==
there are 7 days in a week because it took God 7 days to build the world.
75 / 5 = 15 days for 12 men to build one house. 15x12 = 180 days for 1 man to build 1 house. 180 x 7 = 1260 days for 1 man to build 7 houses. 1260 / 20 = 61 days for 20 men to build 7 houses.
1 7/8 days Matthew in one day can build 1/3 of the block. Andy in one day can build 1/5 of the block. Together in one day they can build 8/15 of the bolck. It means they need less than 1 day to build 7/15 of the block, which is 7/8 of the day. Thus, they need 1 day and 7/8 of the next day to build the block together.
35 days
7 days.7 days.7 days.7 days.7 days.7 days.7 days.7 days.7 days.7 days.7 days.
It takes about 3 days for a robin to build its nest!!
The root word for "instrument" is "instruere," which is a Latin word meaning "to build" or "to construct."
about 21 days...maybe less
168 Hours is 7 Days.
There are: (7*7)+3 = 52 days
The groma wa a surveying instrument.
To convert days to weeks, divide the number of days by 7, since there are 7 days in a week. For 49 days, you would calculate (49 \div 7 = 7). Thus, 49 days is equal to 7 weeks.