1,500 cubic yards is 40,500 cubic feet.
52 cubic yards = 1,404 cubic feet.
1500 sq ft * 4 inches = 1500/9 sq yards * 1/9 yards = 18.518518... cubic yards.
240 cubic feet = about 8.9 cubic yards. (8.88888889 cubic yards).
3 feet = 1 yard 1000 feet / 3 = 333.33333 cubic yards
0.52 cubic yards = 14.04 cubic feet.
Easy to do. Multiply cubic yards by 27 to get cubic feet.
Divide cubic feet by 27 to get cubic yards.
Divide cubic feet by 27 to get cubic yards.
27 cubic feet = 1 cubic yard 837 cubic feet = 31 cubic yards
27 cubic feet = 1 cubic yard 54 cubic feet = 2 cubic yards . . 108 cubic feet = 4 cubic yards
To solve this convert all measurement to a yard or square yard basis: 3 inches is 0.083333333333 yard and 1500 square feet = 1500/9 = 166.6666666666667 square yards Thus the amount of mulch you need is 166.6666666666667*0.083333333333= 13.88888888883333 cubic yards. so you need to purchase 14 cubic yards of mulch for the job.
I'm assuming you mean cubic yards. There are 27 cubic feet in each cubic yard 27cf x 152cy = 1,404 Cubic feet