$94,500
2,700 x 35 = 94,500
(2,700 square feet) / (43,560 square feet per acre) = 0.06198 acre (rounded)
2700 miles per hour is equal to 3960 feet per second.
It is $4.75 per square foot.
To convert dollars per square foot to dollars per cubic yard, you need to consider the dimensionality difference. Since square feet are 2-dimensional measurements and cubic yards are 3-dimensional measurements, you would need to know the height or thickness of the object to make an accurate conversion. Once you have the height or thickness, you can use the conversion factor to calculate the cost per cubic yard.
Convert $24.85 USD per square yards to square meters
If you are looking for the weight of limestone for 6 inches x 3 feet x 3 feet, that will be ABOUT 459 pounds. Limestone aggregate is roughly 2700 pounds per cubic yard.
You need between 20 and 22 btu per square foot in an average home. So, 121 x 20 = 2420 or ~2500. 121 x 22 = 2662 or ~2700. So 2500 to 2700 btu.
it was 1,000 Dollars per square feet $25 per stone Floor stones are about $5 each
$11/1500sq.ft Rephrase your question and ask again.
The cost per square foot is, as you stated, $10. The cost for all 7 acres (304920 square feet) is $3049200.
10.7639104 square feet per square meter 306 square feet / 10.7639104 square feet per square meter = 28.4 square meters